GOOD WORK FOR THE YEAR 2021 - 2022 |
Electrification
ØElectrification of Bhattanagar (Excl.)-Baltikuri (Excl.) (2.7 RKM/2.43TKM) completed on 03.11.2021
ØKanrnasubarna (Excl.) to Khagraghat Road (Excl.) completed on 10.03.2022
ØElectrification of Tribeni Tissuesiding on 29/03/2022
ØKGLE TSS commissioned on 11/06/2021
Reliability Related Works
Ø137 Nos. leaning mast replaced in the previous Financial Year
Ø62 Tight Implanted masts replaced
Ø15.605 Km DC unregulated OHE converted to Conventional AC OHE
Ø06 nos. newly Isolators and section insulators are commission at NDAE, PSAE, PTAE, BSAE, SMAE and DTAE for segregation of Loop line from Main line for increasing reliability and block availability
Ø2.901 Km worn out contact wire replaced
Ø4.405Km Catenary with multiple splices replaced.
Ø05nos.underratedIsolator (800 AMP)replacedby1600AMP Isolator at BDC & BMG Loco Bay – I with 01 no. side earthing heal
Ø450 Meter steel catenary replaced by 107 Sq. mm new catenary wire at Jhill siding.
Ø12.5 MVA Traction Transformer POH under progress in DTAE/TSS first time in Eastern Railway.
Ø38% reduction of Asset Failure from the year 2019 – 20.
ØReturn Feeder 1 connection with New Burried Rail has done at BEQ/FP.
ØMelted connector of TR-1 Burried Rail replaced by new at DKAE/TSS.
Ø02 Nos. TSS at BMAE & BWN, 04 Nos. SSP, 02 Nos. SP land availability has been approved by Divisional level for 160 KMPH power supply related work.
Other Safety work:-
Ø15 nos. OHE slewing work has been carried out by the division in KWAE – AZ section, BDC – KWAE section and KAN – PKR section to assist Engineering department for Bridge girder erection, LHSand FOB work as well as availed shadow block for liquidation of overdue assets.
Staff Related Issues
ØChange of designation of BD Van driver to technician.
ØOutsourcings of PSI activities in BDC -KWAE- AZ, and BWN-KWAE, KAN-PKR-GMAN, NHT-AZ and RPH-DUMK Sections started.
Cost Saving Measures
ØReduction in TA with respect to previous year by 5% .
ØPakur TSS under open access mode from 14.05.21.
Ø66.32% reduction of OT with compared to previous year.
160Kmph work
Ø78.159 TKM (66 nos. Tension length) 160 KMPH OHE modification done in HBC section.
Scrap Sale
Ø349.38 Metric Ton Ferrous and 60.90Metric Ton Non-Ferrous Scrap materials deposited during this financial year 2021-22.
Works
ØCapital expenditure of Rs 13.91 Crore against Budget grant of Rs10.83 Crores
Ø1 Pink Book Work and 2 Law Book work physically completed in the year 2021-22