Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter View Content in Hindi
National Emblem of India

About Us

Divisions

News & Updates

Tenders

Supplier Information

Passenger information

Contact Us

About Us
   Workshop
      KANCHRAPARA
         Departments
            IT Centre
               Area of Working


 
Bookmark Mail this page Print this page
QUICK LINKS
Area of Working

Major Activities of IT Centre:-

1.AIMS/IPAS: (Accounting Information Management System/ Integrated    Payroll Accounting System):-

Payroll: Generation & Printing of various payroll reports, Salary Reports and Generation & Processing of bill unit wise salary bills etc.

Incentive: Online Direct Workers Incentive entry, Processing, Validation & freezing, Incentive adjustment (if any), Generation of Incentive Appendix report, SSE Incentives generation etc.

I-Tax:  Preparation of various I-Tax Reports (Annexure-I, II) to be uploaded to NSDL by Accounts.

Misc Activities: (i)IPAS User Management (Activation, Deactivation, Bill Unit Privilege, Sectional Privilege), (ii) Assisting & trouble shooting of various problem related to Cadre, Payroll, Leave, Bill Passing, Executive Bill, PF, Pension, Book etc. arising out from IPAS end user from time to time, (iii) Acquittance Statements & Other Managerial Reports as required by the Administration from time to time etc.

2.WISE (Workshop Information System):-

This system reflects total history of coach and loco entered in workshop, till its dispatch with system designed reports POH History, Berth Bay Report, Wagon Outturn Summary, RS Wise Assembly Report. Although, the database of WISE has been designed by IT Centre/KPA with collaboration of CRIS but being a workshop based package with day to day activity, it is now operated by workshop users. IT Centre/KPA is attached with populating Holiday List and mapping of some users in WISE portal as and when required.

3.WGR (Workshop General Register):-

WGR is a combine of (i) work order, (ii) Implementation of Online WGR module of WAMS (AIMS) and Implementation of Offline WGR module.

4.Revised Costing:-

(i) Offline Revised POH costing reports are being generated from D-base application.

(ii) Online Revised Electric Loco POH Costing reports are being generated from WAMS costing module.

5.Website Updation:-

Monitoring and regular updating of official website of Kanchrapara Workshop. (Under subsection of www.er.indianrailway.gov.in)

6.Centralized AMC of PCs & its peripherals and Internet Connectivity:-

Centralized AMC for Monitoring & Maintenance  of all type of PC, Laptop, Printer, UPS etc under Kanchrapara Workshop and 300 MBPS Railnet network connectivity by outer agency.

Other Activities:-

(i) Technical vetting of IT related items i.e. PC & PC peripherals.

(ii) Handling of CWM/KPA’s official Twitter account and grievance redressal.

(iii) Procurement and monitoring of all items of PWP 2024-2025 under PH-17.

 (iv) Procurement & distribution of IT hardware & other electronic items under the work of “Upliftment & Improvement of infrastructure for critical work centre of KPA workshop” under PH-42 controlled by Dy. CME(G)/KPA.

(v)  Billing System of electric consumption for outside party (Private-172 Nos., Central govt.-28 Nos., KV School- 2 Nos.)

(vi) Successful running of VCs and other conferences organized time to time.

(vii) Addition of new assets M&P portal and providing computerized number of new M&P items.

Infrastructure of Eastern Railway Workshop, Kanchrapara related to IT Centre:

A.PC & PC-Peripherals:



Line Matrix Printers at Console room of IT Centre/KPA: 



B.          Local Area Network(LAN) with Equipment:

LAN Equipment included with Optical Fiber Cables (OFC) - 2500 Mtrs,UTP Cables(cat-6) as mentioned below:

Sl No.

Item Descriptions

Units

Quantity

1

5 port unmanaged Switch(10/100Mbps)

Nos.

08

2

5 port unmanaged Switch(1Gbps)

Nos.

40

2

8 port unmanaged switch(1Gbps)

Nos.

38

3

24 port managed Switch(1Gbps)

Nos.

03

4

24 unmanaged Switch(1Gbps)

Nos.

10

5

Router (10/100Mbps)

Nos.

01

6

Router (1Gbps)

Nos.

04


Local Area Network Diagram of KPA Workshop


 

C.         300 MBPS Railnet for MPLS VPN usage.


 Internet user at KPA workshop is approx. 465.

 Allotment of 290 nos. IPs for CCTV camera and Biometric machines.

 Connected with Industry 4.0 project.

 200 nos. IP have also been issued for SIP phone.





Source : Eastern Railway CMS Team Last Reviewed : 28-08-2025  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.