inner-banner-img

workshop


Coaching


 

Main Activities of LHB Section

1) POH of coaches: AC and Non-AC including new generation coaches viz.LHB, Hybrid, Double Decker.

2) Intermediate Overhaul (IOH) of LHB,Hybrid,Doubledeker, Shatabdi and other 18 Month Mail / Express coaches.

3) Supply of IOHed ICF & LHB Coach Bogies to ECR.

4) Refurbishing of coaches both AC & Non AC.

5) Retrofitment of Environment friendly Bio-Toilet in Coaches.

6) Bogie Frame for LHB Coaches.

7) Fire Detection and Supression System in Pantry and Power Car.

8) Conversion of Camping Coaches (RCC).

9) Ventury fitment in Coach Toilet for ICF/NAC Coaches.

10) Utkrist coaches outturn achieved its target.

11) Upgraded LHB/NAC LS-3 to LS-5 with “FIBA” device installed.

12) Conversion of Deck Coach for Traction department to maintain and repair of overhead traction line.

Special Activities during Lockdown Period for COVID-19

1) This Workshop turned out 121 nos. Isolation Coaches for COVID-19.

2) Face Mask produced in house in LLH Shop.

3) Paramedic Suits produced in house in LLH Workshop.

4) Coverall (with QR code) made by this Workshop.

OUT-TURN AT A GLANCE

                            

 

                            

           

 

 

 

 

 

Source : Eastern Railway Last Reviewed : 21-07-2026