|
Electrical Department · Overhaul and repair of electrical equipments including Roof mounted AC Package unit, Alternators, Motors, Compressors, Power Car, Transformers, Fans etc. · Provision of Tube Light fittings in Non-AC Coaches including lavatories, Laptop / mobile charging points in AC and GSCN coaches. · Distribution of Power Supply in workshop, colony, hospital and service buildings. · Maintenance of Pumps for Drinking water & pumping out of water from drains. APRIL, 2026 Work Report Overhauling & Repairing of Electrical Equipment’sCoaching Wing Data:Coaching Wing Data: I. RMPU: 100 nos. (ICF- 06 nos., LHB-94 nos.VB-0 nos.) II. Alternator: AC (25KW) – 06 nos., Non AC (4.5 KW) –55 nos. III. Power Car: 06 nos. (LHB- 06 No. & ICF-00 No.) IV. Provision of mobile charging points & USB Points in coaches: - (a) AC-01 coach [LHB-01 coach (Additional requisite Points to equalize the no. of berth)] (b) Non-AC-00 coaches (ICF-00 & LHB-00) V. Provision of aerosol Fire detection and suppression system cartridge in 01 No. Coaches [LHB-01 & ICF-00] VI. Replacement of bellow duct with Meta/Para Aramide Fabric Bellow duct in LHB Coaches: - 00 coaches. Power Wing Data: Maintenance/Overhauling of I. Transformer: 02 nos. (Transformer-1 & Transformer-2 at BTC Substation) II. HT & LT Panel: a) HT VCB: 06 nos. (06 nos. at BTC) b) LT ACB: 12 nos. (08 Nos. at BTC Substation & 04 nos. at Shop floor under FSS jurisdiction) III. Pump: a) 5HP submersible pump replaced. b) 3HP Pump motor set replaced. c) Main panel MCCB of pump No.-4 replaced. IV. EOT crane/Hoist:a) Overhauling: 03 nos.(i) MRP-1002 – Hoisting panel cont. unit, timer O/L replaced, (ii) MRP-987 – Thruster and Trailing cable replaced, (iii) KP-162 – LT coupling replaced. b) Preventive Maintenance & Safety Checking: - 35 nos.
|

Accessibility Controls