Electrical


 

Electrical Department
 

· Overhaul and repair of electrical equipments including Roof mounted AC Package unit, Alternators, Motors, Compressors, Power Car, Transformers, Fans etc.
 

·  Provision of Tube Light fittings in Non-AC Coaches including lavatories, Laptop / mobile charging points in AC and GSCN coaches.
 

·  Distribution of Power Supply in workshop, colony, hospital and service buildings.
 

·   Maintenance of Pumps for Drinking water & pumping out of water from drains.

APRIL, 2026 Work Report

Overhauling & Repairing of Electrical Equipment’s

Coaching Wing Data:

Coaching Wing Data:

I. RMPU: 100 nos. (ICF- 06 nos., LHB-94 nos.VB-0 nos.)

II. Alternator: AC (25KW) – 06 nos., Non AC (4.5 KW) –55 nos.

III. Power Car: 06 nos. (LHB- 06 No. & ICF-00 No.)

IV. Provision of mobile charging points & USB Points in coaches: -

(a) AC-01 coach [LHB-01 coach (Additional requisite Points to equalize the no. of berth)]

(b) Non-AC-00 coaches (ICF-00 & LHB-00)

V. Provision of aerosol Fire detection and suppression system cartridge in 01 No. Coaches

[LHB-01 & ICF-00]

VI. Replacement of bellow duct with Meta/Para Aramide Fabric Bellow duct in LHB Coaches: - 00

coaches.

Power Wing Data:

Maintenance/Overhauling of

I. Transformer: 02 nos. (Transformer-1 & Transformer-2 at BTC Substation)

II. HT & LT Panel:

a) HT VCB: 06 nos. (06 nos. at BTC)

b) LT ACB: 12 nos. (08 Nos. at BTC Substation & 04 nos. at Shop floor under FSS jurisdiction)

III. Pump:

a) 5HP submersible pump replaced.

b) 3HP Pump motor set replaced.

c) Main panel MCCB of pump No.-4 replaced.

IV. EOT crane/Hoist:

a) Overhauling: 03 nos.

       (i) MRP-1002 – Hoisting panel cont. unit, timer O/L replaced,

      (ii) MRP-987 – Thruster and Trailing cable replaced,

      (iii) KP-162 – LT coupling replaced.

b) Preventive Maintenance & Safety Checking: - 35 nos.

 

 