inner-banner-img

our-division


Information


LOCO HOLDING (As on 01.08.24)

 

Type/ Shed

WDP4D

WDM3D

WDM3A

WDM2

WDM6

WDS6R

WAG7

WAG5

WAP4

TOTAL

Howrah

16

16

09

-

-

17

-

-

33

91

Burdwan

-

-

-

-

-

-

28

68

 

96

 

PERFORMANCE AT A GLANCE

DIESEL:

SL. No

ITEM

SHED

CLASS

TARGET 2024-25

2024-25                               (July)

2024-25

(Up to July)                              

 

2023-24

 (Up to July)

1

Asset Failure

HWH

M/Line Loco

25

01

03

06

2

Punctuality loss (Direct)/100 Loco Link/Month

HWH

M/Line Loco

1.50

0.00

0.00

2.61

3

Main line Outage (Goods+Passenger)

HWH

M/Line Loco

28.32

(Up to July)

26.78

30.05

24.12

5

Lube oil consumptin/100 EKm

HWH

ALCO  M/Line loco

1.00

0.97

(June’24)

0.97

( Up to June’24)

1.00

( Up to June’23)

HWH

HHP loco

1.60

1.13                        (June’24)

0.74

( Up to June’24)

1.57

( Up to June’23)

HWH

Shunting loco

0.50

0.48                                      (June’24)

0.48                            ( Up to June’24)

0.47                              ( Up to June’23)

 

Lube oil to Fuel oil Ratio

 

HWH

ALCO  M/Line loco

0.28

0.33                               (June’24)

0.32                              ( Up to June’24)

0.30                          ( Up to June’23)

 

 

 

6

HWH

HHP loco

0.39

0.49                                     (June’24)

0.32                     ( Up to June’24)

0.40            

( Up to June’23)

HWH

Shunting loco

0.40

0.37                                        (June’24)

0.39                       ( Up to June’24)

0.41                                ( Up to June’23)

 

 

 

ELECTRIC:

SL. No

ITEM

SHED

TARGET

 2024-25  

(Up to July)

2024-25                               (July)

2024-25                               (Up to July)

 

2023-24

(Up to July)

1

Asset Failure in nos

HWH

-

03

09

7

BWN

-

03

18

17

Total

 

-

06

27

24

2

Main line Outage (Goods+

Passenger)

HWH

21.60

18.22

20.37

13.74

BWN

58.19

74.07

67.19

39.64

Total

 

79.79

92.29

87.56

53.38

3

Under Repair

HWH

2.40

5.78

3.64

1.26

BWN

13.65

6.93

4.64

6.36

       

Total

 

16.05

12.71

8.28

7.62

Source : Eastern Railway Last Reviewed : 14-07-2026