|
MECHANICAL (DIESEL & DISASTER MANAGEMENT) DEPARTMENT
INTRODUCTION Sealdah Division is spread over major districts of West Bengal namely Kolkata, North and South 24 Parganas, Nadia and Murshidabad. Mechanical (Diesel and Disaster Management) Department looks after the operation and maintenance of Diesel and Electric locomotives , Disaster Management Team comprising of “A” Class ART at BGA, 140 Ton BD Crane, HS-SPARMV, Divisional Motor Vehicles, maintenance of Electronic In-motion and Static Weigh Bridge and Fire Extinguishers etc. International Train Services (Maitree Express), Bandhan Express including Bangladesh Goods services between India and Bangladesh are also looked after by this department. Mechanical (Diesel and Disaster Management) Department is headed by Sr.DME(Dsl & Disaster Management) along with 03 Nos. Assistant Officers – AME(P) and AME(Dsl)
1.INCREASED OF LOCO HOLDING: From 11.12.2024 sdad shed is holding & maintaining 10 nos. Additional wap7 electric locomotives to made sealdah division self reliant for providing locomtives to passenger trains. Total holding: 40 nos. Wap7 Enable division to save Path & Crew for transferring locomotives from HWH Division
2.REDUCTION OF INSPECTION TIME:
üReduction of inspection time has increased the loco outage of shed. üIA, IB SCH. – On same day. üIC SCH.-On three shift
3INCREASED OF LOCO OUTAGE:
4. 5.RELIABILITY IMPROVEMENT OF PASSENGER LOCOMOTIVES:
Reliability Improvement: üGTO BUR have successfully replaced with IGBT based 3x130 kVA BUR in 02 nos. locos : o1. Loco No- 30329on 19.07.2024 o2. Loco No- 30490on 17.10.2024 üReplacement of Failure prone M/s BHEL make out of warranty Traction Converter (SR) with M/s ATIL make SR : o1. Loco No- 30490 on 17.10.2024 6.INSTALLATION OF HIGH REACH PANTOGRAPH:
üInstallation & commissioning of high reach pantograph in SDAH based 06 nos.WAP7 locos.
üDETAILS OF LOCOMOTIVE Loco NO.30327 30329 30371 30370 30494 30455 7.Installation & Commissioning of High Capacity (7775KVA) Transformer & HLC to make 10 Nos. SDAD based Loco HOG Compliant in FY 24-25:
8.INSTALLATION OF KAVACH
In FY 24-25 fourteen (14) numbers of KAVACH have been installed in Sealdah based WAP7 locomotives.
KAVACH FITMENT DONE in FY 24-25: 30525 30458 30552 30455 30494 39263 30300 30370 30311 37609 30490 37610 30295 30469
9.Installation and commissioning of Light Run Test Bench:
10.Installation and commissioningof dedicated VCBSet up Room inaugurated by GM/ER on 07.02.2025
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

Accessibility Controls