|
SPECIFICATION
|
|
Sealdah Division is predominately Coaching specially a suburban oriented division but it has a mixed blend of Mail/Express & Freight operation :
|
|
|
·Major Coaching Terminal
·Major Section
·Freight Terminal
·Container Terminal
|
o Sealdah & Kolkata Terminal.
o Main, North, CCR & South
o Chitpur, Naihati & Budge Budge
o Kantapukur in Majerhat & Cossipore.
|
| |
|
SINGLE SECTION
|
TRIPLE LINE SECTION
|
QUADRUPLE LINE SECTION
|
DOUBLE LINE SECTION
|
|
1.DUM DUM – MAJHERHAT(18.4 KM)
2.SHANTIPUR-KRISHNANAGAR (15.29KM)
3.MURSHIDABAD JN. – AZIMGANJ JN. (6.57 KM)
4.RANAGHAT-BANGAON(32.93 KM)
5.CHAMPAPUKUR-HASNABAD (18.4 KM)
6.LAKSHMIKANTAPUR-NAMKHANA (46.56KM)
7.KALYANI-KALYANI SIMANTA(4.78 KM)
8.KRISHNANAGAR CITY JN.-AMGHATA (8.29KM)
|
1.M5B Cabin - New Alipore (1.67 km.)
2.Naihati - Kalyani (10.37 k.m)
|
1.Sealdah – Naihati (37.64 km.)
2.Ballygunge - M5B (2.92 km.).
|
Other than the mentioned sections.
|
|
|
|
TRACK
|
|
STATION
|
|
· Total Track Km.
· Total Route Km.
· Equated Track Km.
|
1755.332
715.37
2796.306
|
|
Total nos. of Stations and Block cabin
|
211
|
|
· Block Stations
· Flag Stations
· Halt Stations
· Block Cabin
|
99
54
53
05
|
| |
|
LC GATE
|
|
BRIDGE
|
|
· Special Class
· “A” Class
· “B” Class
· “C” Class
· “D” Class
|
100
32
82
170
Nil
|
|
· Important
· Major
· Minor
· LHS
· RUB
· ROR
· ROB
|
05
84
869
28
71
09
36
|
| |
|
SYSTEM OF TRAIN WORKING
|
|
Automatic Signaling
|
· Sealdah – Kalyani (48.01 KM)
· Sealdah – Baruipur Jn. (24.74 KM)
· Dum Dum Jn.–Barasat Jn.(15.24 KM)
· Ballygunge – Mile 5B (2.92KM)
· Mile 5B-New Alipur(1.67km)(Goods DN line, Passenger Line)
|
|
|
|
|
One Train Only
|
· Kalyani – Kalyani Simanta (4.78 KM)
· Krishnanagar City Jn. – Amghata Halt. (8.29 KM)
|
|
|
|
|
Absolute Block
|
· Other than the mentioned sections.
|
| |
|
COACHING TRAIN PARTICULARS
|
|
First AC EMU(Suburban) inugarated on 11/08/25, SDAH-RHA
|
|
Total nos. of trainsè 1081
|
|
|
124
|
(Eastern Railway-100, Foreign -24) (Sealdah-52, Koaa-72)
|
|
|
30
|
(Intra division-20,Inter Division-10)
|
|
|
927 (Including 10AC EMU)
|
(Main-340, HWH-6, Central-192,CCR-44, South-334, Lalgola-11)
|
|
|
|
TRAINS WITH FOREIGN COUNTRY
|
|
The Maitree Express and Bandhan Express are two international passenger trains connecting with Bangladesh Railway. Five Up Maitree Express are being originated in a week from Kolkata Terminal on Monday, Tuesday, Wednesday, Friday and Saturday similarly five Down trains are being received from Bangladesh on Sunday, Tuesday, Wednesday, Friday and Saturday. Bandhan Express is being originated from KOAA on Sunday and Thursday as biweekly and runs to Khulna (Bangladesh) via BNJ and biweekly down direction are being run on same days.
(Non Operational from 19/07/2024)
|
|
| |
|
FREIGHT OPERATIONS
|
|
·18 Nos. GOODS SHED
·22 Nos. Private & Industrial Siding. (15 Private, 7 Assited)
|
| |
|
LOADING
|
GUNNY BALES
|
•TITAGARH
•NAIHATI
|
|
|
|
|
CONTAINER
|
•CTKR
•K.P.DOCK
|
|
|
|
|
FERTILIZER
|
•K.P DOCK
•TITAGARH
•CHITPUR
|
|
|
|
MAJOR INWARD COMMODITIES
|
•CEMENT
•FERTILIZER
•FOOD GRAINS
•CONTAINER
•COAL
|
| |
|
STATUS OF IT PROJECTS
|
|
FOIS
ICMS
|
· Goods related IT project RMS (Rake Management System) and TMS (Terminal Management System)under FOIS are functional at five and sixteen terminals respectively including proxy control, whereas Coaching related IT project ICMS (Integrated Coaching Management System) is functional at five terminals from where VG (Vehicle Guidance) is being generated for all originating Mail/Express as well as Passengers trains.
|
|
|
|
|
CMS
COA
|
· Crew related IT project CMS (Crew Management System) is functional over all of Eight Crew Booking Lobbies (SDAH Main & North, Sealdah South, KOAA, DDJ, BT, NH, RHA & MJT) of this division. Twelve outmost stations are connected with CMS namely KRP, BPC, KNJ, STB, GEDE, BNJ, HNB, SPR, DH, CG, LKPR & NMKA.
· Project COA (Control Office Application) is also functional at all of five Control Boards of this division and it has already been integrated with ICMS and FOIS also.
|
|
|
|
|
TMS
ONLINE TSR
CAUTION
|
· TMS (Train Management System) project has been installed & working in between SDAH & RHA (73.18 km.) since 31.08.2023 at Divisional Control Room / Sealdah .
· SM related IT project Online TSR has been implemented at five stations namely BLN, NACC, NH, KYI & CSZ in this division.
· Section-wise Caution Orders both permanent and temporary are being fed into COA module on regular basis & also ICMS generated Caution is being served to all the services.
· Section-wise Caution Orders both permanent and temporary are being fed into COA module on regular basis & also ICMS generated Caution is being served to all the services.
|