FREIGHT OPERATING PERFORMANCE UP TO MAR 2025-26

           

 

         

LOADING

CUMULATIVE

MILLION TONNES

     

%AGE VARIATION

Target

2025-26

2024-25

Target

Last Year

COAL (MT)

3.410

3.905

2.101

14.52

85.86

GG (MT)

14.590

14.121

12.884

-3.21

9.60

TOTAL (MT)

18.000

18.026

14.985

0.14

20.29

           

 

         

LOADING

CUMULATIVE

(WAGON/DAY)

     

%AGE VARIATION

Target

2025-26

2024-25

Target

Last Year

Coal (WAGON/DAY)

139

156

130

12.23

20.00

GG (WAGON/DAY)

628

598

593

-4.78

0.84

Total (WAGON/DAY)

767

754

723

-1.69

4.29

           

 

         

GOODS EARNING

CUMULATIVE

(₹ IN CRORE)

     

%AGE VARIATION

Target

2025-26

2024-25

Target

Last Year

COAL

44.08

55.15

43.17

25.11

27.75

GG

1233.03

1062.49

1077.61

-13.83

-1.40

TOTAL

1277.11

1117.64

1120.78

-12.49

-0.28

           

 

         

PUNCTUALITY

CUMULATIVE

(in % Age)

     

%AGE VARIATION

Target

2025-26

2024-25

Target

Last Year

MAIL EXP

93.00

89.79

91.20

-3.21

-1.41

PASSENGER

85.00

72.83

72.38

-12.17

0.45

 

INTERCHANGE

CUMULATIVE

(TRAINS/DAY)

     

%AGE VARIATION

Target

2025-26

2024-25

Target

Last Year

Interchange All

NIL

144.2

150.6

NIL

-4.25

MLDT - NF Rly OMLF

39.6

40.3

-1.74

MLDT - HWH Dvin. GMAN

42.5

50.2

-15.34

MLDT - HWH Dvin. GSGB

24.2

19.2

26.04

MLDT - ECR Rly MGR

18.4

19.4

-5.15

MLDT - ECR Rly KIUL

10.9

12.1

-9.92

MLDT - ASN Dvin. DUMKA

8.6

9.4

-8.51

MLDT - Dvin. HRLT

0.0

0.0

-

           

 

         

OTHER OPERATING

CUMULATIVE

PERFORMANCE

     

%AGE VARIATION

Target

2025-26

2024-25

Target

Last Year

Holding (EWU/Day)

5100

5166

4702

1.28

-9.87

Elec utilisation (Av KM)

340

263

300

29.28

-12.33

Dsl utilisation (Av KM)

320

278

266

15.11

4.51

WTR

NIL

1.4

1.2

NIL

-16.67

Inward Release

NIL

1189

1198

NIL

-0.75

NTKM (Millions)

6075.00

6014.23

5860.75

-1.00

2.62

NTKM (Wagon/Day)

2763

3393

3679

22.80

-7.77

Speed (Av/Day) Including

13.03

11.28

12.41

15.51

-9.11

Speed (Av/Day) Excluding

NIL

15.58

16.67

NIL

-6.54

 

 

 

Some important achievements of March 2025-26

Goods Loading

Upto March 2026, the total Revenue loading was 18.026 MT as compared to 17.357 MT during the corresponding period of last year.

Goods Earnings

Upto March 2026, the total Goods earning of the division was Rs. 1117.60 crores against Rs. 11120.78 crores of corresponding period of last year.

Punctuality of Mail Exp. & Passenger Trains

Upto March 2026, we achieved Mail Express Trains of 89.79%, as compared to 90.20% in same month of last year.

Upto March 2026, we achieved Passenger     Trains of 72.83%, as compared to 72.38% in same month of last year.

Interchange

Upto March 2026 avg. Interchange is 144.2 Rakes/day against 150.6 Rakes/day. correspondingmonth of last year.

Inward Release

Upto March 2026 average Inward release was 1189 Wagons/Day against 1198 Wagons/Day correspondingmonth of last year.

Wagon Holding

Upto March 2026 average Wagon Holding per day was 5166 Wagons/Day against 4702 Wagons/Day correspondingmonth of last.

Electric Utilization

Upto March 2026 average Electric Utilization was 263 Avg. Km/Day against 300 Avg. Km/Day correspondingmonth of last year.

Diesel Utilization

Upto March 2026 average Diesel Utilization was 278 Avg. Km/Day against 266 Avg. Km/Day correspondingmonth of last year.

Wagon Turn-Round

Upto March 2026 Wagon Turn-Round of Malda Division is maintained at the levelof 1.4.

 

 

 

GUIDELINES FOR ALLOTMENT AND ROTATIONAL POLICY FOR SUPPLYOF RAKES FOR BANGLADESH TRAFFIC

For movement to Bangladesh from ER, different policy decisions have been formulatedtime to time and many decisions have been taken in the interest of Railways for increase in loading from ER. A comprehensive guideline combining all the earlier policies and decisions has been enumerated in this order.

Since the dynamics of all the commodities is different and also the quota allotted byRailway Board is changing month to month, the guidelines for allotment of different commodities will be different. Guidelines for different commodities are as follows:

1.COMMODITYWISEGUIDELINES

1.1.STONE(EXCLUDINGOUTOFTURNQUOTAGIVENBYRAILWAY   BOARD)

1.1.1.Rotationalpolicyisbeingfollowedinthecaseofstoneforalldestinationsseparately.

1.1.2.Since maximum numbers of indents in stone are in Maida and Howrah division and         alsosinceMLDTandHWHdivisionsarethe majorstoneloadingdivisionstraditionally,the             maximum quota is being given to these divisions. As per the position of the indents          and the goods shed availability for loading, Asansol division is also given allotment for    stone. The decision in this respect is being taken by ER HQ.

1.1.3.The allotment is being rotated in Howrah and Malda division by ER HQ alternatively to the             extent possible.

1.1.4.Within division, rotations of loading points are being maintained by the division and are             rotated from point to point in cyclic manner.

1.1.5.Due to the operational problem or some force majeure condition or to increase loading on             some day, the turn of any loading division or loading point might be bypassedbut           it had             been adjusted as early as possible.

1.1.6.The policy of minimum 7 days old indent has been suspended since 2019 and will            remain             suspended till further orders.

1.1.7.The newloadingpoints, if openedare included in the rotationcycle bydivision as per the             operational requirement.

1.1.8.Any new interchange point if started with Bangladesh then the rotation cycle of the          new point will remain same as other existing points but starting of the cycle will be      decided by the division as per the operational constraints and loading requirements.

1.1.9.ODR of Boulder rakes will be kept separately and rotation policy for these will be            same as        listed in point 1.1.1 to 1.1.8.

1.1.10.Thecurrentsystemasenumeratedaboveinpoint1.1.1to1.1.9willbefollowed             henceforth also.

1.2.STONE (OUT OF TURN QUOTA GIVEN BY RAILWAY BOARD)

1.2.1.Special quota for indents for entities/organization approved by Railway Board for out of             turn priority is to be kept out of purview of divn rotation for allotment of Stone    rakes.

1.2.2.Special quota for indents for entities/organization approved by Railway Board for out of             turn priority is to be kept out of purview of rotational cycle of good shed/sidings in a             division for allotment of stone rakes.

1.2.3.Allotment is to be decided as per list/priority list given by the approved entities every     month in number of rakes.

1.2.4.If Railway Board allots any further special quota for Stone loading to Bangladesh for       any new organization, same policy as proposed above to be followed.

 

1.3.FOOD GRAIN

1.3.1.Foodgrainsincluderice.wheat,maizeandfoodgrain.

1.3.2.ODRofeachtypeofthesecommoditieswillbekeptseparately.

1.3.3.Allotment of these commodities is beingdone on the basis of ODR in the Zone to the       extent possible.

1.3.4.AllotmentofthesecommoditiesisbeingdonebyERHQ asperpoint1.1.3.

1.3.5.In case of operational constraint, the allotment is being given to ODR of some other        division. But station ODR is always followed.

1.3.6.There are some goods sheds where the inward pipeline is normally heavy. Therefore,             allotment of BDR loading from these terminals may hinder the inward release.    Therefore, the allotment of these commodities for these terminals is by-passedif the         inward pipelineis heavy. The allotment in these terminals is adjusted on future dates as per    availability of quota and inward pipeline position.

1.3.7.Some goods sheds load for other domestic destinations also. For these goods sheds,         turn may be skipped for increase in loading of ER but they will be adjusted as early as             possible as per the availability of quota and operational constraints.

1.3.8.The policy enumerated in point 1.3.1 to 1.3.7 will be followed henceforth.

1.4.FLY ASH

1.4.1 Allotment for Fly Ash loading for Bangladesh destinations shall be done on rotational       basis instead of Zonal ODR basis from Fly ash loading points over Eastern Railway.      The rotational sequence for such loading for Darsana (DSN) and Rohanpur (RIP)    shall be in      the pattern from loading points ‘PSPM – NTKS – SURI - MMMT’.If any          new destination        in Bangladesh is added in future apart from DSN & RIP, the same cyclic pattern shall be       followed.Further, if indent for ‘Fly Ash’ is registered in any   new loading point over    Eastern Railway, the same will be added after end of the above cycle

1.5.CONTAINER AND PARCEL

1.5.1Loading of container is being done by CONCOR only from two terminals of CTKR           and CTDI.The allotment will be given as per the requirement of CONCOR. For            Parcel,            the allotment will be given as per the ODR and operational flexibility.

2.GENERALGUIDELINES

2.1.DivisionwillmaintaintheODRandrotationcycleexceptoutofturnquotastonerakes.

2.2DivisionwillmaintainaseparateODRlistforoutofturnquotastonerakes.

2.3RestrictionsimposedbyRailwayBoardtimetotimewillbefollowed.

2.4The commodity wise guidelines will be followed to the extent possible keeping in            view the      different operational constraints and maximization of loading of ER.

            ThisissueswiththeapprovalofCompetentAuthority.

 

SIDINGS/GOODS SHED WISE ROTATIONAL SEQUENCE FOR ALLOTMENT OF STONE RAKESFOR BANGLADESH

A.ThisistodeclarethatthesequenceofallotmentofstonetraffictoBangladeshis      being rotatedwithinthedivisionsi.e.HWH,MLDT&ASNbyEasternRailwayHQ       alternatively to the extent possible.

B.Divisionsmaintainfollowingrotationalsequenceofallotmentofstonerakesfor      Bangladesh amongtheirloadingpointsincyclicmanner.

Division

Commodity

Destination

RotationalsequenceofAllotment

Remarks

HOWRAH

StoneChips in BCN

DSN

HRNS, PKRW, PKRX, TKSS, PKRZ, RSCS, KSIK, PRGR, RJPS,PKRY, CTR.

The new loading points, if opened, are included in the rotation cycle by division as per the operational requirement

.

BEN

CTR,PKRY,PKRW,PKRZ,RSCS,RJPS,PKRX,HRNS,PRGR,

TKSS,KSIK.

RIP

CTR,TKSS,KSIK,HRNS,RSCS,RJPS,PKRW,PRKZ,PRGR,

PKRX,PKRY.

BLE

CTR, PKRZ, RSCS,PKRY, PKRW, RJPS, KSIK, PKRX, TKSS, PRGR, HRNS.

CHLT

PKRX,PKRW,CTR,TKSS,PKRY,HRNS,PRGR,KSIK,RJPS,

PKRZ.

Stone Boulders in BOXN

DSN

HRNS,CTR,RSCS,RJPS,PRGR,PKRW,PKRX,KSIK,PKRZ,

PKRY,TKSS.

RIP

CTR,HRNS,TKSS,PRGR,PKRW,PKRX,PKRY,RSCS,PKRZ,

KSIK.

BLE

CTR,HRNS,RJPS,PRGR,RSCS,PKRW,PKRX,KSIK, PKRZ,PKRY,TKSS.

CHLT

CTR,PKRX,PKRW,HRNS,PRGR,RJPS,RSCS,PKRY,PKRZ,

TKSS.

MALDA

Stone chips in BCN

RIP/DSN/ BEN/BLE

BPSH, BKLE, BKGS, BKIR, BKMT, TPH, TJPS, MSQS, SLJ, SLJG, SBG, SBGG, MZC, PCLS, RJL, SSGS, QSBK, PQLB, NPBW, BLPS, KRMA.

CHLT

BKLE, BKGS, BKIR, BKMT, TPH, TJPS, MSQS, SLJ, SLJG, SBG, SBGG, MZC, PCLS, RJL, SSGS, QSBK, BPSH, PQLB, NPBW, BLPS, KRMA.

Stone boulders in BOXN

DSN

BPSH, BKGS, BKMT, BKIR, TJPS, MSQS, QSBK, SSGS, RJL, SBG, SLJG, PQLB, NPBW, BLPS, KRMA.

BLE

BPSH, BKGS, BKIR, BKMT, TJPS, MSQS, RJL, QSBK, SLJG, PQLB, NPBW, BLPS, KRMA.

BEN/CHLT

BPSH, BKGS, BKIR, BKMT, TJPS, MSQS, SLJG, SBG, RJL, SSGS, QSBK, PQLB, NPBW, BLPS, KRMA.

ASANSOL

Stone chips

in BCN

DSN/RIP/

BEN/BLE

DUMK, SURI, CTDI.

Stone boulders in

BOXN

DSN/RIP/ BEN/BLE

SURI, BCQ, CTDI, MUW, VDS.

SIDINGS/GOODS SHED WISE ROTATIONAL SEQUENCE FOR ALLOTMENT OF FLY ASH RAKESFOR BANGLADESH

 

Commodity

Destination

Rotational sequenceof

Allotment

Remarks

FlyAsh

DSN/RIP

PSPM-NTKS-SURI- MMMT

IfanynewdestinationinBangladeshisaddedin future apart from DSN & RIP,the same cyclic patternshall be followed. Further, if indent for ‘Fly Ash’ isregisteredinanypointoverE.Rly,thesamewillbe addedafterendoftheabovecycle.

 

 