|
Some Goods Loading Upto March 2026, the total Revenue loading was 18.026 MT as com Goods Earnings Upto March 2026, the total Goods earning of the division was Rs. 1117.60 cr Punctuality of Mail Exp. & Passenger Trains Upto March 2026, we achieved Mail Express Trains of 89.79%, as compared to 90.20% in same month of last year. Upto March 2026, we achieved Passenger Trains of 72.83%, as compared to 72.38% in same month of last year. Interchange Upto March 2026 avg. Interchange is 144.2 Rakes/day against 150.6 Rakes/day. Inward Release Upto March 2026 average Inward release was 1189 Wagons/Day against 1198 Wagons/Day Wagon Holding Upto March 2026 average Wagon Holding per day was 5166 Wagons/Day against 4702 Wagons/Day Electric Utilization Upto March 2026 average Electric Utilization was 263 Avg. Km/Day against 300 Avg. Km/Day Diesel Utilization Upto March 2026 average Diesel Utilization was 278 Avg. Km/Day against 266 Avg. Km/Day Wagon Turn-Round Upto March 2026
GUIDELINES FOR ALLOTMENT AND ROTATIONAL POLICY FOR SUPPLYOF RAKES FOR BANGLADESH TRAFFIC
For movement to Bangladesh from ER, different policy decisions have been formulatedtime to time and many decisions have been taken in the interest of Railways for increase in loading from ER. A comprehensive guideline combining all the earlier policies and decisions has been enumerated in this order. Since the dynamics of all the commodities is different and also the quota allotted byRailway Board is changing month to month, the guidelines for allotment of different commodities will be different. Guidelines for different commodities are as follows: 1.COMMODITYWISEGUIDELINES
1.1.STONE(EXCLUDINGOUTOFTURNQUOTAGIVENBYRAILWAY BOARD) 1.1.1.Rotationalpolicyisbeingfollowedinthecaseofstoneforalldestinationsseparately. 1.1.2.Since maximum numbers of indents in stone are in Maida and Howrah division and alsosinceMLDTandHWHdivisionsarethe majorstoneloadingdivisionstraditionally,the maximum quota is being given to these divisions. As per the position of the indents and the goods shed availability for loading, Asansol division is also given allotment for stone. The decision in this respect is being taken by ER HQ. 1.1.3.The allotment is being rotated in Howrah and Malda division by ER HQ alternatively to the extent possible. 1.1.4.Within division, rotations of loading points are being maintained by the division and are rotated from point to point in cyclic manner. 1.1.5.Due to the operational problem or some force majeure condition or to increase loading on some day, the turn of any loading division or loading point might be bypassedbut it had been adjusted as early as possible. 1.1.6.The policy of minimum 7 days old indent has been suspended since 2019 and will remain suspended till further orders. 1.1.7.The newloadingpoints, if openedare included in the rotationcycle bydivision as per the operational requirement. 1.1.8.Any new interchange point if started with Bangladesh then the rotation cycle of the new point will remain same as other existing points but starting of the cycle will be decided by the division as per the operational constraints and loading requirements. 1.1.9.ODR of Boulder rakes will be kept separately and rotation policy for these will be same as listed in point 1.1.1 to 1.1.8. 1.1.10.Thecurrentsystemasenumeratedaboveinpoint1.1.1to1.1.9willbefollowed henceforth also. 1.2.STONE (OUT OF TURN QUOTA GIVEN BY RAILWAY BOARD) 1.2.1.Special quota for indents for entities/organization approved by Railway Board for out of turn priority is to be kept out of purview of divn rotation for allotment of Stone rakes. 1.2.2.Special quota for indents for entities/organization approved by Railway Board for out of turn priority is to be kept out of purview of rotational cycle of good shed/sidings in a division for allotment of stone rakes. 1.2.3.Allotment is to be decided as per list/priority list given by the approved entities every month in number of rakes. 1.2.4.If Railway Board allots any further special quota for Stone loading to Bangladesh for any new organization, same policy as proposed above to be followed.
1.3.FOOD GRAIN 1.3.1.Foodgrainsincluderice.wheat,maizeandfoodgrain. 1.3.2.ODRofeachtypeofthesecommoditieswillbekeptseparately. 1.3.3.Allotment of these commodities is beingdone on the basis of ODR in the Zone to the extent possible. 1.3.4.AllotmentofthesecommoditiesisbeingdonebyERHQ asperpoint1.1.3. 1.3.5.In case of operational constraint, the allotment is being given to ODR of some other division. But station ODR is always followed. 1.3.6.There are some goods sheds where the inward pipeline is normally heavy. Therefore, allotment of BDR loading from these terminals may hinder the inward release. Therefore, the allotment of these commodities for these terminals is by-passedif the inward pipelineis heavy. The allotment in these terminals is adjusted on future dates as per availability of quota and inward pipeline position. 1.3.7.Some goods sheds load for other domestic destinations also. For these goods sheds, turn may be skipped for increase in loading of ER but they will be adjusted as early as possible as per the availability of quota and operational constraints. 1.3.8.The policy enumerated in point 1.3.1 to 1.3.7 will be followed henceforth. 1.4.FLY ASH 1.4.1 Allotment for Fly Ash loading for Bangladesh destinations shall be done on rotational basis instead of Zonal ODR basis from Fly ash loading points over Eastern Railway. The rotational sequence for such loading for Darsana (DSN) and Rohanpur (RIP) shall be in the pattern from loading points ‘PSPM – NTKS – SURI - MMMT’.If any new destination in Bangladesh is added in future apart from DSN & RIP, the same cyclic pattern shall be followed.Further, if indent for ‘Fly Ash’ is registered in any new loading point over Eastern Railway, the same will be added after end of the above cycle 1.5.CONTAINER AND PARCEL 1.5.1Loading of container is being done by CONCOR only from two terminals of CTKR and CTDI.The allotment will be given as per the requirement of CONCOR. For Parcel, the allotment will be given as per the ODR and operational flexibility. 2.GENERALGUIDELINES
2.1.DivisionwillmaintaintheODRandrotationcycleexceptoutofturnquotastonerakes. 2.2DivisionwillmaintainaseparateODRlistforoutofturnquotastonerakes. 2.3RestrictionsimposedbyRailwayBoardtimetotimewillbefollowed. 2.4The commodity wise guidelines will be followed to the extent possible keeping in view the different operational constraints and maximization of loading of ER. ThisissueswiththeapprovalofCompetentAuthority.
SIDINGS/GOODS SHED WISE ROTATIONAL SEQUENCE FOR ALLOTMENT OF STONE RAKESFOR BANGLADESH A.ThisistodeclarethatthesequenceofallotmentofstonetraffictoBangladeshis being rotatedwithinthedivisionsi.e.HWH,MLDT&ASNbyEasternRailwayHQ alternatively to the extent possible. B.Divisionsmaintainfollowingrotationalsequenceofallotmentofstonerakesfor Bangladesh amongtheirloadingpointsincyclicmanner.
SIDINGS/GOODS SHED WISE ROTATIONAL SEQUENCE FOR ALLOTMENT OF FLY ASH RAKESFOR BANGLADESH
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

Accessibility Controls