TRACTION DISTRIBUTION

SEALDAH

EASTERN RAILWAY

q TRACTION DISTRIBUTION DEPARTMENT of SEALDAH DIVISION is responsible for maintenance & operation of Overhead equipments, Power supply installations, Substation Installations & remote control to supply necessary electric power to Electric Locomotive/EMU in Sealdah Division of Eastern Railway.

q Electric Traction with 25KV ac was first commissioned on Sealdah Division in 1963 between Sealdah – Naihatiand out of total 715.69 RKM in this division 690.075 RKM, i.e. 96.32% route is electrified. The total electrified TKM in Sealdah Division is 1724.606.

q Traction power supplied from various Feeding post and traction sub-station is controlled by Traction Power Controller (TPC) from Remote Control Centre situated at Sealdah control room.

q The total number of switching station in this division is 73 including Feeding Post/Traction sub-station. All the operations of these switching posts are controlled by TPC from RCC at Sealdah i.e. remotely operated from RCC at Sealdah.

q The Remote control system is completely microprocessor based SCADA system where data is logged along with supervisory control. In Sealdah Division SCADA communication is done through OFC.

q The OHE is maintained by 12 Nos.OHE depots located at Narikeldanga (Sealdah), Barrackpore, Halisahar, Ranaghat, Debagram, Cossimbazar, Barasat, Basirhat in Sealdah North & Central Section and Sealdah (South), Sonarpur, Baruipur & Lakshmikantapur in South Section.

q Power supply installations are maintained by three nos. depots located at Narkeldanga (Sealdah), Naihati, Sonarpur and one sub depot at Debgram.

      Besides this Division has one Central Store Depot located at Sealdah, one Tower Wagon Maintenance Depot located at Narkeldanga. Also one Construction Depot located at Sealdah is looking after different Construction activities executed by this division.

q 25 KV, 50 Hz Single Phase supply for electric traction to feed OHE in SDAH Division is taken from West Bengal State Electricity Distribution Co. Ltd. Sealdah Division receives Power at two levels – 25 KV Single Phase supply derived from 5 Grid sub-station owned by WBSEDCL and feed to OHE though 5 feeding post viz. Titagarh, Ranaghat and Ashoknagar in SDAH/North Section and Sonarpur and Lakshmikantapur in SDAH/South Section and 132KV supply taken from WBSEDCL through Railway owned Traction Transformer (21.6 MVA) at Barasat Traction Sub-station, Debagram Traction Sub-station & Cossimbazar Traction Sub-station and 132KV supply taken from M/s CESC through Railway owned Traction Transformer (21.6 MVA) at Chitpore.

 


A S S E T S



Sl.

No.


Items



Present Status of SDAH Division



1.



Electrified Route (Km)



690.075



2.



Electrified Track (Km)



1724.606



3.



132 KV Traction Sub Station



04 

(Chitpore, Barasat, Debagram , Cossimbazar)



4.



Feeding Posts



05


(TGH, RHA, ASKR, SPR & LKPR)



5.



Switching Station



64



6.



Staff Strength (S/S)



856 (0.4965 per TKM)



7.



Total on Roll Staff



793 (0.46 per TKM)



8.



OHE Maintenance Depots



12



9.



PSI Maintenance Depot



3



10.



Tower Wagons



16

(8 Wheeler – 05 nos.
4-Wheeler – 11 nos.)


O R G A N I S A T I O N


B. NON-GAZETTED 

Category

Sanctioned Strength

On-roll

Vacancy

SSE

57

45

12

JE

36

29

07

Artisan

461

370

91

Group - D

256

312

(-)56

Ministerial

46

37

9

TOTAL

856

793

63





PARTICULARS OF ELECTRIFICATION

Section

Year of Commissioning

Electrified

TKM

Sealdah – Krishnanagar,

Dum Dum jn. – BallY Halt

Kalinarayanpur – Shantipur

1963-65

446.907

Dum Dum Jn. – Bangaon

1964

92.69

Sealdah – Lakshmikantpur, Budgebudge, Canning, Diamond Harbour

1965-66

287.69

Kalyani – Kalyani Simanta

1979

6.53

Dum Dum Jn.– Dum Dum Cant. Doubling

1981

3.0

Dum Dum Cant. – Birati Doubling

1982

3.50

Birati – Barasat Doubling

1983

9.00

Barasat – Duttapukur Doubling

1993

7.80

Duttapukur – Guma Doubling

1994

7.70

Guma – Ashoknagar Doubling

1995

3.50

Ashoknagar – Habra Doubling

1996

3.40

Lakshmikantpur – Kakdwip

1992 - 2000

35.80

Ranaghat – Gede

2000

90.00

Ranaghat – Bongaon

2001

35.00

Dumdum – Prinsepghat

2001

15.51

Barasat – Hasanabad

2002

60.00

Double Line New Alipur – Budgebudge

2000-2005

15.89

Double Line Sonarpur Champahati

2005

7.90

Kakdwip – Namkhana

2005

13.63

Prinsep Ghat – Majerhat

2006

5.75

1. Kolkata Terminal- 4.60

2. Chitpur Yard Electrification- 107

(Ph-I)(Temporary diversion ULR-Belgachia)

2006

5.707

Dum Dum Cantt. – N. S. C. Bose Air Port

2006

3.80

Namkhana yard

2006

5.60

Double Line Champahati- Ghutiyarisarif

2006

8.10

Double Line Habra - Machlandapur

2006

9.68

FCI/KYI

2006

3.046

Turn Table Line at Narkeldanga

2007

0.20

Double Line KNJ - BDZ

2007

9.00

Up Loop Line at CDH

2007

1.033

Chitpur Line No. 14

2007

1.887

Additional Loop Line at Baranagar Road

2007

1.15

Krishnanagar - Lalgola

2007

147.768

New Double Line BIJ - BDZ

2008

8.04

Baruipur Jn. – DPDP Doubling

2008

6.50

DPDP-DBT Doubling

2009

10.45

PWI Siding Kalyani Extention

2009

1.732

CP Yard line no. 3,4,6,10,11 & 12

2009

2.80

CP Yard PF No. 4 & 5 (KOAA PF)

2009

4.12

Machandapur – Chandpara UP/L

2010

4.13

Machandapur – Chandpara UP/L

2010

9.147

KLNP- BIJ Dn line

2010

4.61

Goods loop line and 01 no. X-over at Aranghata (AG)

2010

1.33

New Up line BRP-HT

03.01.2011

7.69

New Up line BT-SXC

15.03.2011

13.00

New EMU Loco shed line at RHA

18.03.2011

10.32

New DN line HT -MGT

11.07.2011

9.403

STB-KNJ (conversion narrow to broad gauge)

05.09.2011

13.315

CDP - BNJ

29.02.2012

14.116

GOF-CG

14.05.2012

14.385

14.385

Conversion of Malatipur (F) station in to Block station

Running track

1.319

Conversion of Madhyampur (Halt) station into block station

Running track

1.980

Coversion of labutala (Halt ) station into Block station

Running track

0.666

EMU Loco Shed at RHA Car shed

EIG on 18.03.11 for 10.32 TKM and 2.734 TKMOHE electrified during 2012-13

2.734

Electrification of line no. 6 at BNJ

Running track

0.97

MPJ loop line

Running track

0.61

New platform 9C at SDAH(N)

Running track

0.60

Magrahat station to Deula station (doubling)

EIG - 26.02.2013
CRS -08.10.2013

9.477

Deula station to Diamond Harbour station (doubling)

EIG -26.02.2013
CRS -08.10.2013

10.51

New UP line from Phulia Station to Shantipur Jn. and New DN line between Phulia Station and Shantipur Jn

EIG - 10.05.2013
CRS - 04.12.2013

7.100

Entire Cossipore yard

EIG - 09.05.2013

4.600

New UP & DN line from Dakshin Barasat station to Laksmikantapur station

EIG - 19.09.2013
CRS - 24.01.2014

19.68

New DN line From Lagola Station to Bhagwangola

EIG - 13.12.2013
CRS - 06.12.2013

15.30

Electrification ofMarshal Yard at RHA

Marshaling Yard

0.197

Electrification of loop line no. 4 at GXD

Running track

0.923

Electrification of NSS line no-6

Car shed

0.618

Electrification of stabling lineat SPR Car Shed

Car shed

0.375

Electrical of new DN line from Dhubulia – Krishnanagar

EIG - 27.06.2014

CRS– 06.08.14

12.55

Electrical of new DN line from Bethuadahari– Dhubulia

EIG - 30.06. 14

CRS – 06.08.14

15.37

Electrical of new DN line from Bhagwangola– Jiaganj

EIG - 29.09. 14

CRS – 16.10.14

11.52


Electrical of new DN line from KLNP – FLU

EIG - 18.11.14

CRS – 16.12.14

8.572

Electrical of new DN line from BTY – PLY

EIG - 06.03.2015

CRS – 16.03.2015

27.65

Electrification of Marshal YardLine no. - 12, 13, 14 & 15at RHA

Marsal Yard

3.00

Good Shed NH Line no. -1

Good Shed

0.8

NH EMU stabling line

Stabling line

0.4

Plassey – Beldanga, DN Line

EIG- 29.01.2016

CRS – 04.03.2016

17.40

Jiaganj – Cossimbazar, DN Line

EIG – 04.08.2016

CRS – 21.10.2016

14.74

Labutala – Champapukur, Up Line

EIG- 04.10.2016

CRS – 22.12.2016

17.437

Cossimbazar – Beldanga, Dn/Line

EIG- 07.12.2016

CRS – 23.01.2017

21.620

Electrification of Old Sick Line No. – 1, 2 and shunting neck

DEC-2016 &

Jan-2017

1.209

Halisahar – GFAE BYP Line

30.07.2018

0.838

Particulars of section-wise break up of Route Kilometre (Electrified)

SL.

No.

ROUTE

NAME

Total length (KM)

1

SDAH - GEDE

Sealdah - Gede

116.45

2

DDJ - BLYH

Sealdah – Bali holt

8.9125

3

DDJ - MJT

Dum Dum - Majerhut

18.40

4

KGK – BLN Chord

Kankurghachhi - Ballygunge

6.53

5

KLNP - STB

Kalnarayanpur – Shantipur Jn

15.85

6

STB - KNJ

Shantipur Jn – Krishnanagar City Jn.

15.23

7

KYI - KLYM

Kalyani – Kalyani Simanta.

4.78

8

NH - GEAE

Naihati - Gorifa

2.6225

9

RHA - BNJ

Ranaghat Jn – Bangoan Jn

32.93

10

DDJ - BNJ

Dum Dum Jn - Bangoan Jn

69.42

11

BT - HNB

Barasat - Hasnabad

52.30

12

RHA - LGL

Ranaghat Jn – Lalgoal

153.7

13

SDAH - DH

Sealdah – Diamond Harbour

59.50

14

BLN - BGB

Ballygunge – Budge Budge

20.44

15

SPR - CG

Sonar pur - Canning

29.01

16

BRP - LKPR

Baruipur – Lakshmikantapur

36.72

17

LKPR - NMKA

Lakshmikantapur - Namkhana

46.56

18

NH - HLR

Halisahar – GFAE BYP Line

0.74

Total Route Kilometer

690.075





Source : Eastern Railway CMS Team Last Reviewed on: 14-03-2019  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.