Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter View Content in Hindi
National Emblem of India

About Us

Divisions

News & Updates

Tenders

Supplier Information

Passenger information

Contact Us

Divisions
   SEALDAH
      Departments
         Electrical/General


Goto Yahoo!!


 
Bookmark Mail this page Print this page
QUICK LINKS
Electrical/General


 WELCOME

Electrical General Department

Eastern Railway, Sealdah



Organisation Chart


Assets of Electrical (Power wing)

Power Supply installation

WBSEDCL Supply points (HT)

21 nos

CESC supply points (HT)

22 nos

WBSEDCL Supply points (LT)

357 nos

CESC supply points (LT)

86 nos

Standby DG Sets

27 nos

Total no. of stations

204 Nos

Electrified stations

204 Nos

Non-Electrified station

Nil

Other Asset

Electrified occupied Quarters

4284

Lifts

41 nos

Escalator

12 nos

Major Building/Complex

6 nos

Electrified LC Gate

410 nos

Non-Electrified LC Gate

nil

Central AC plant

71 nos

AC package Unit

16 nos

Window AC unit

380 nos

Split AC unit

581 nos

Tower AC

6 nos

Non-traction Energy Consumption & Bill pattern

Year

Consumption (MU)

Bill (Rs in Crore)

2015-16

50.54

44.18

2016-17

48.26

40.67

2017-18

45.95

39.39

2018-19

42.35

37.16

2019-20

41.58

36.55

2019-20 (Apr to Oct’19)

27.71

24.09

2020-21(Apr to Oct’20)

21.04

18.52


POWER WING

ACHIEVEMENT DURING 2019-2020

1.Illumination has been improved in line of airport standard as per directive of Railway Board in sixteen nos Railway stations.

Sl no

Name of the station

Code

Category

1

Sealdah

SDAH

NSG-1

2

Naihati

NH

NSG-2

3

Berhampur Court

BPC

NSG-4

4

Dumdum Jn

DDJ

SG-2

5

Krishnanagar city Jn

KNJ

SG-2

6

Barrackpore

BP

SG-2

7

Sonarpur

SPR

SG-2

8

Agarpara

AGP

SG-3

Sl no

Name of the station

Code

Category

9

Dumdumcant

DDC

SG-3

10

Dattapukur

DTK

SG-3

11

Ballygaunge

BLN

SG-3

12

Park circus

PQS

SG-3

13

Machlandapur

MSL

SG-3

14

Magrahat

MGT

SG-3

15

Ichapur

IP

SG-3

16

Narendrapur

NRPR

HG-3

2.Provision of two nos HVLS (HIGH VOLUME LOW DISCHARGE) fans of 24 feet sweep with following specification in south passenger hall of Sealdah Railway station.

ØSpecification of HVLSfan:-

Discharge of air flow

No of blades

Sweep

maximum speed

Weight

Noise level

Motor capacity

328000 CFM

3

24 feet

65 rpm

85 kg

below 65 dB

1kW ,BLDC gearless

ØAdvantage:-

·Huge energy saving.

·Noise level reduced to minimum.


 3.Commissioning of 6kv/750volt Compact substation at Sealadah Coaching yard under PH 16; LB-51 of 2019-20.

ØAdvantage:-

·Power supply will be supplied to LHB coaches while maintenance at Yard.

·This will reduce the requirement of HSD oil combustion at yard while maintenance.

·It will also reduce the pollution at yard.

4.Provision of 500kwp solar panel on pf shed/Building roof under PPP model.

Station

Location

Capacity

Date of installation

Kolkata Terminal Railway

PF shed(Pf no-1,2+3)

468.72 kwp

10.04.19

Narkeldanga Rly colony

Roof top of RPF Barrack

31.68 kwp

31.07.18

ØSaving per annum=500*90%* 4hrs*30 days*12 month*Rs(6.99-5.69)

                                          =Rs 842400/-

                                          = Rs 8.42 lakh (approx)

5.Provision of 120 KWP solar panel on PF shed (pf no-2+3 & 4+5) at NaihatiRailway station against sanctioned work under PH 53; LB-717 of 2019-20. (DOC=07.09.19)

                    ØSaving per annum=120*90%*4hrs*30 days*12 month*Rs7.12

                                         =Rs 1107302/-

                                         = Rs 11 lakh (approx)

6.Air conditioning ofSealdah Crew Lobby, Bangaon, Barasat, Kolkata Terminal, HansbadLakshmikantapurRunning Room.

7.Electrification and air conditioning of newly constructed conference room in the 2nd floor of Officers’ Rest House (210) at Sealdah.

8.Air conditioning of renovated Female Medical Ward –III at B. R. Singh Hospital with the following centralized AC plant-

Type

Capacity

Make

Qty

Outdoor unit

12 HP

Hitachi

6 nos

Indoor Unit

13.22 TR

Hitachi

4 nos

9.Provision of 68 nos newenergy efficient AC machine in different locations over SDAH division:

Type

Capacity

Qty

Window

1.5 TR

25 nos

Split

2.0/1.5 TR

39nos

Tower AC

3.5TR

4nos

10.Electrification of newly constructed Level crossing gate no: - 1/A/E/Spl in between TALA-Bagbazar Railway station in connection with the demolition of TALA ROB.

11.Installation and commissioning of two nos elevator of capacity 10 passengers, G+2, ‘’Johnson’’make near SBI ATM at Sealdah Railway station.

12.Complete rewiring of renovated female Medical ward-III at B. R. Singh Hospital with the provision of the following-

·2x20 watt LED indoor fitting = 25 nos

·1 x18 watt LED fitting=19 nos

·Surface mounted LED fitting 12 watt =33 nos

·Geyser 15 ltrs capacity, ‘Bajaj’ make =1 no

·Ceiling fan 1200mm sweep=12 nos

·Exhaust fan ,380 mm, CG make =3 nos

13.Provision of local power supply in the following manned L.C. Gate for reliability of power supply.

Ø72/E- in between Bahadurpur- Dhubulia Railway Station.

Ø54/E-in between Pyradanga-Ranaghat RailwayStation.

Ø65/E- in between Badukulla-JalalkhaliRailway Station.

Ø70/E- in between Krishnagar city Jn -Bahadarpur Railway.

Ø66/E- in between Jalalkhali- Krishnagar city Jn.

14.Provision of 34nos 30 amp RDSO Panel, in place of manual changeover switch at different LC gate for reliability of power supply.

15.Installation and commissioning of one no 20 mtr high polygonal high mast tower with the provision of six nos 200 watt LED flood light fittingat Diesel shed near ART at Sealdah yard.

16.Electrification of following newly constructed service building:-

ØCloak room and RMS office at Sealdah Raiway station

Øsouth crew booking lobby at Sealdah Raiway station

ØParcel cash counter at Sealdah Raiway station

ØStation director chamber at Sealdah Railway station.

ØTTE rest room on 2ndfloor at Sealdah Railway station.

ØVIP Lounge in 1st floor of B.R. Singh Hospital

ØZonal training centre at Kancharapara Railway station

ØBooking office at Bagula Railway station.

ØBooking office at Bamonghachi Railway Station.

ØBooking office at Subhasgram Railway Station

ØPI CabinBagula Railway Station.

ØPF shed on pf no-1; 2+3 and 4+5 Barasat Railway station.

ØPF shed on pf no-2 at BiraRailway station.

17.Electrification of newly constructed sub way at:-

ØBelghoria Railway station.

ØBarasat Railway station.

 18.Provision of one no submersible pump of capacity 1000 gph,150 feet head ,1.1 HP,KSB make in newly constructed well of size4″X3″ at Satberia Railway Station.

 19.Installation of one submersible pump of capacity 10000 gph at 180 feet head, 15HP,’KSB’make in newly constructed boring of size 8''x12'' at Narkeldanga Railway colony.

 20.Installation of submersible pump of capacity 5000 GPH x 150 ft. head complete with Motor of cap. 7.5 HP in newly sunk deep tube well of size 150mmx 200 mm at Jadavpur and 47m x 6 CMH at total head of 25m, HP - 1.0 in newly sunk deep tube well of size 50mm x 100mm Kalikapur Railway Station.

21.Total 520 nos unauthorized tapping removed as a measure of energy conservation.

22.Replacement of 108 ( one hundred eightnos) nos heavy duty high wattage ceiling fans by light weight low wattage ceiling fans.

23.Twenty one nos. Conventional energy meter have been replaced with Digital type energy meter as a measure of energy conservation.

Achievements during 2020-21(up to November’2020)

ØInstallation and commissioning of two nos elevator of capacity 10 passengers, G+3, ‘’Johnson’’ make for Crew/Guards near South Booking office at Sealdah Railway station.

ØElectrification of newly constructed Booking at the following Railway Station:-

·Mallickpur Railway Station

·HabibpurRailway Station.

·Jaynagar MajilpurRailway Station.

·Bankimnagar Railway Station.

·Panchbera Railway Station.

·Taraknagar Railway Station.

·Bathnakritibas Railway Station.

ØProvision of 21 (twenty one) nos star rated AC machines in place of conventional AC machine at different locations.

ØProvision of 9 nos star rated AC machines at different locations.

ØAir conditioning of B.C Roy Auditorium at SDAH. Stage lighting, façade lighting and general lighting done at B.C Roy Auditorium at SDAH.

ØAir conditioning of all Running Rooms over SDAH Division.

ØProvision of one no submersible pump of capacity 5000 gph at 150 feet head, ‘’KSB’’ make in newly constructed deep tube well of size 200mmx150mm at Namkhana Railway Station.

ØProvision of eight nos HVLS fan at SDAH station.

ØProvision of ten nos RDSO panel in different LC gates for better reliability of power supply.

ØInstallation and commissioning of Centralised AC in Nephrology ward in BRSH of 24 HP withHEPA filter and all new wiring and fittings including Fan and Light within a month time and handed over on 15 July.

ØInstallation and commissioning of Centralised AC in ICU/S in BRSH now Covid -19 ward of 32 HP with with the facility of HEPA filter, UV filter, fresh air provision and all new wiring and fittings including Fan and Light within record time of 10 days.Installation and commissioning of Solar water Heater in BRSH in metro building of 3500lts/hrs capacity Which will cater the load of entire building and kitchen.

ØElectrification of renovated Staff canteen (Santusthi) at Old Koilaghat Building.

   ØDISCOM authority energy meter shifted from old Booking office to New Booking oat Subhasgram and Mallickpur Railway station.

ØInstallation of two nos escalator of capacity 9000 persons per hour at Sealdah Railway station.

ØReplacement of 27 (twenty sevennos) nos heavy duty high wattage ceiling fans by light weight low wattage ceiling fans.

  ØNew wiring and air-conditioning of newly constructed seminar hall in Engineering department of DRM Building.

ØProvision of twenty three nos pre paid energy meter of capacity 5-60 Amp, ‘Secure’ make in place of conventional energy meter in different stalls (outsider) at Sealdah Railway Station.

ØProvision of local power supply (single phase,230 vollt,2 KW ) in the following L.C gate:-

ØE/49 in between Karanjali-Nischindapur Market Railway Station.

ØE/42 in between Kulpi- Karanjali Railway Station

ØE/23 in between Jaynagar Majilpur- Mathurapur Road Railway Station.

ØT/20 in between Baruipur- Mallickpur Railway Station

ØE/23 in between Baruipur-Kalyanpur Railway Station.

ØE/11 in between Gocharan-Hogla Railway Station

ØT/13 in between Dakshin Barasat-Kalyanpur Railway Station

   ØElectrification of newly constructed Toilet at Bankimnagar & Panchbera Railway Station.

  ØElectrification of newly constructed Gang Hut at Bankimnagar , Taraknagar & MayurhatRailway Station.

ØProvision of eleven nos GI tubular pole of 5.5 mtr long with 45 watt LED outdoor fitting in place of defective MS tubular pole on pf no-2 at Shasan Road Railway station.

ØProvision of ten nos GI octagonal pole, 5.5 mtr high, in place of seven nos MS tubular pole and three nos rail pole with the provision of 45 watt LED outdoor fitting on pf no-5 at Sealdah Railway Station.

ØProvision of 70%-30% lighting arrangement at Ichhapur, Sonarpur, Gocharan, Sodepur, Agarpur, Belghoria, Ghutiarisharrff, Kalinarayanpur and Bidyadharpur Railway Station.



COACHING WING

COACHING WING ASSETS

Assets of Coaching wing (AC)

Sl. No.

Type of Coach

Total Holding

SDAH

CP

Total

1

WGFAC

4

1

5

2

WGFACCW

8

0

8

3

WGACCW

37

6

43

4

WGACCN

81

40

121

5

WGCWNAC

0

10

10

6

WGSCZAC

5

9

14

7

LWLRRM

28

16

44

8

LWFAC

10

5

15

9

LWFCWAC

4

3

7

10

LWCBAC

11

3

14

11

LWACCW

31

9

40

12

LWACCN

129

37

166

13

LSCZAC

0

6

6

14

WRRMDAC

0

4

4

15

WACCNH1

0

11

11

Total

348

160

508

Assets of Coaching wing (Non AC)

Sl. No.

Type of Coach

Total Holding

SDAH

CP

Total

1

GSCN

241

129

370

2

GS

208

113

311

3

GSCZ

44

39

83

4

SLR/SLRD

87

47

134

5

WCB

0

7

7

6

FC

0

0

0

7

PPS

0

4

4

8

YZZS

3

0

3

9

YS

11

0

11

10

LSCN

33

65

98

11

LS

15

23

38

12

LSLRD

2

0

2

13

VP

1

0

1

Total

635

427

1062












ØPower car holding

LHB type Power car: 44 nos.                            ICF type Power car: 4 nos.

Cummins make engine: 65 nos.                            Cummins make engine: 8 nos.

Greaves Cotton make engine: 21 nos.

Kirloskar make engine: 2 nos.

TL & AC Activity Centers & Trains in brief

ØActivity centres:

1.1. Primary Depot 1: Sealdah (NCC yard,NSS yard, Sick line & Platform)

1.2. Primary Depot 2: Chitpur (Maintenance yard, Sickline and Platform)

1.3. Secondary attention at Berhampore Court.

ØScheduled Mail / Express Trains at depots

Depots

Primary trains

Primary rakes

Secondary trains

Secondary rakes

Sealdah

23

40

2

4

Chitpur

25

25

9

11

Total (Div)

48

65

11

15

Achievement during 2019-2020

· ZERO non AC case en-route during 2019-20

· HOG CONVERSION OF TRAINS

11 LHB trains, (8 rakes) overhauled by Electric LOCO have been converted to run in HOG mode.

· PUSH PULL MODIFICATION

Successful trial run in Push Pull mode (with existing control cable of S&T dept) of Rajdhani rake from SDAH to RHA has been carried out on 02.08.19.

Push pull modification of Rajdhani Rakes

In first phase, vide contractual agreement through LOA no. ELEG/OT/742R/2019-20, Dt. 25.10.19, M/s Contact Consotium has modified of 49nos. coaches & Power cars to run 2 nos. Rajdhani rakes in Push Pull mode.

· Extra Coach Movement

- 1736 nos. AC and 1130 non AC coaches were in service to clear extra rush.

- 14 Nos AC coaches and 21 nos TL coaches have been augmented on permanent basis with primary trains of SDAH & CP depot.


Achievements

(April’2020 to Nov’2020)

· Both rakes of Padatik Express have been converted to HOG compliant and running in HOG mode since 07.06.2020.

·Both rakes of Darjeeling mail have been converted to HOG compliant and running in HOG mode since 20.10.2020 as 02343/44 SDAH- NJP Festival special.

· HOG modification of all LHB power cars and Coaches has been completed. Conversion of ICF manufactured KOAA - PNBE Garib Rath Power cars and coaches are in the verge of completion.

· Service of 02021/02 SDAH – BBS Covid special has been started with single Power car and one LSLRD from 14.08.2020.

·HOG Implementation in scheduled trains & calculated savings of HSD oil due to HOG service

Sl. No.

Primary Train No.

Train Name

OHE Electri-fication Status

HOG Operation in between

HOG done on

Round trip duration in HOG mode

Trip per year

Fuel saving on HOG/ trip

Fuel savings/ year

(in Ltr)

1

12313/

12314

Rajdhani Exp

Fully

SDAH - NDLS

25.11.16

35:30:00

365

4115.8

1502279

2

12259/

12260

Duronto Exp.

Partly

SDAH - NDLS

17.12.17

34:05:00

208

4163.5

866008

3

12329/

12330

WB S K Exp.

Fully

SDAH- DLI

12.09.19

45:05:00

52

5461.1

283978.9

4

12379/

12380

Jalianwalabag Exp.

Fully

SDAH- ASR

06.09.19

61:10:00

52

7133.5

370942

5

22323/

22324

Shabdabhedi Exp.

Fully

KOAA- GCT

14.02.20

27:25:00

52

3287.2

170932.7

6

13121/

13122

KOAA - GCT Weekly Exp.

Fully

KOAA- GCT

16.02.20

29:30:00

52

3444.8

179131.3

7

12315/

12316

Ananya Exp.

Partly

KOAA- SWM

26.12.19

53:30:00

52

6649.5

345774

8

12317/

12318

Akal Takht Exp.

Fully

KOAA- ASR

22.12.19

67:00:00

104

7734.8

804422.7

9

12357/

12358

Durgiana Exp.

Fully

KOAA- ASR

07.01.20 01.02.20

58:50:00

104

3470.5

360932

10

12319/

12320

Kolkata Agra Exp.

Partly

KOAA- DDU

19.02.20

20:12:00

52

1379.6

71738.33

11

13135/

13136

Joynagar Exp.

Partly

KOAA - BJU

22.02.20

20:55:00

52

1439.2

74836.67

12

12377/

12378

Padatik Exp

Partly

SDAH - NJP

08.07.20

19:45:00

365

2350.3

857871.7

13

22317/

22318

Humsafar Express

Fully

SDAH - JAT

31.12.18

69:00:00

52

7656.0

398112

14

22201/

22202

Puri Duranta

Fully

SDAH - PURI

06.09.19

17:30:00

156

1037.7

161876

15

13167/

13168

KOAA- Agra Cant Exp.

Partly

KOAA - DDU

19.03.20

22:07:00

52

1494.2

77696.67












Phase wise Special trains offered for passengers during Covid-19 pandemic situation