WELCOME
Electrical General Department
Eastern Railway, Sealdah
Organisation Chart
Assets of Electrical (Power wing)Power Supply installation
WBSEDCL Supply points (HT) | 21 nos |
CESC supply points (HT) | 22 nos |
WBSEDCL Supply points (LT) | 357 nos |
CESC supply points (LT) | 86 nos |
Standby DG Sets | 27 nos |
Total no. of stations | 204 Nos |
Electrified stations | 204 Nos |
Non-Electrified station | Nil |
Other Asset
Electrified occupied Quarters | 4284 |
Lifts | 41 nos |
Escalator | 12 nos |
Major Building/Complex | 6 nos |
Electrified LC Gate | 410 nos |
Non-Electrified LC Gate | nil |
Central AC plant | 71 nos |
AC package Unit | 16 nos |
Window AC unit | 380 nos |
Split AC unit | 581 nos |
Tower AC | 6 nos |
Non-traction Energy Consumption & Bill pattern
Year | Consumption (MU) | Bill (Rs in Crore) |
2015-16 | 50.54 | 44.18 |
2016-17 | 48.26 | 40.67 |
2017-18 | 45.95 | 39.39 |
2018-19 | 42.35 | 37.16 |
2019-20 | 41.58 | 36.55 |
2019-20 (Apr to Oct’19) | 27.71 | 24.09 |
2020-21(Apr to Oct’20) | 21.04 | 18.52 |
POWER WING
ACHIEVEMENT DURING 2019-2020
1.Illumination has been improved in line of airport standard as per directive of Railway Board in sixteen nos Railway stations.
Sl no | Name of the station | Code | Category |
1 | Sealdah | SDAH | NSG-1 |
2 | Naihati | NH | NSG-2 |
3 | Berhampur Court | BPC | NSG-4 |
4 | Dumdum Jn | DDJ | SG-2 |
5 | Krishnanagar city Jn | KNJ | SG-2 |
6 | Barrackpore | BP | SG-2 |
7 | Sonarpur | SPR | SG-2 |
8 | Agarpara | AGP | SG-3 |
Sl no | Name of the station | Code | Category |
9 | Dumdumcant | DDC | SG-3 |
10 | Dattapukur | DTK | SG-3 |
11 | Ballygaunge | BLN | SG-3 |
12 | Park circus | PQS | SG-3 |
13 | Machlandapur | MSL | SG-3 |
14 | Magrahat | MGT | SG-3 |
15 | Ichapur | IP | SG-3 |
16 | Narendrapur | NRPR | HG-3 |
2.Provision of two nos HVLS (HIGH VOLUME LOW DISCHARGE) fans of 24 feet sweep with following specification in south passenger hall of Sealdah Railway station.
ØSpecification of HVLSfan:-
Discharge of air flow | No of blades | Sweep | maximum speed | Weight | Noise level | Motor capacity |
328000 CFM | 3 | 24 feet | 65 rpm | 85 kg | below 65 dB | 1kW ,BLDC gearless |
ØAdvantage:-
·Huge energy saving.
·Noise level reduced to minimum.
3.Commissioning of 6kv/750volt Compact substation at Sealadah Coaching yard under PH 16; LB-51 of 2019-20.
ØAdvantage:-
·Power supply will be supplied to LHB coaches while maintenance at Yard.
·This will reduce the requirement of HSD oil combustion at yard while maintenance.
·It will also reduce the pollution at yard.
4.Provision of 500kwp solar panel on pf shed/Building roof under PPP model.
Station | Location | Capacity | Date of installation |
Kolkata Terminal Railway | PF shed(Pf no-1,2+3) | 468.72 kwp | 10.04.19 |
Narkeldanga Rly colony | Roof top of RPF Barrack | 31.68 kwp | 31.07.18 |
ØSaving per annum=500*90%* 4hrs*30 days*12 month*Rs(6.99-5.69)
=Rs 842400/-
= Rs 8.42 lakh (approx)
5.Provision of 120 KWP solar panel on PF shed (pf no-2+3 & 4+5) at NaihatiRailway station against sanctioned work under PH 53; LB-717 of 2019-20. (DOC=07.09.19)
ØSaving per annum=120*90%*4hrs*30 days*12 month*Rs7.12 =Rs 1107302/-
= Rs 11 lakh (approx)
6.Air conditioning ofSealdah Crew Lobby, Bangaon, Barasat, Kolkata Terminal, HansbadLakshmikantapurRunning Room.
7.Electrification and air conditioning of newly constructed conference room in the 2nd floor of Officers’ Rest House (210) at Sealdah.
8.Air conditioning of renovated Female Medical Ward –III at B. R. Singh Hospital with the following centralized AC plant-
Type | Capacity | Make | Qty |
Outdoor unit | 12 HP | Hitachi | 6 nos |
Indoor Unit | 13.22 TR | Hitachi | 4 nos |
9.Provision of 68 nos newenergy efficient AC machine in different locations over SDAH division:
Type | Capacity | Qty |
Window | 1.5 TR | 25 nos |
Split | 2.0/1.5 TR | 39nos |
Tower AC | 3.5TR | 4nos |
10.Electrification of newly constructed Level crossing gate no: - 1/A/E/Spl in between TALA-Bagbazar Railway station in connection with the demolition of TALA ROB.
11.Installation and commissioning of two nos elevator of capacity 10 passengers, G+2, ‘’Johnson’’make near SBI ATM at Sealdah Railway station.
12.Complete rewiring of renovated female Medical ward-III at B. R. Singh Hospital with the provision of the following-
·2x20 watt LED indoor fitting = 25 nos
·1 x18 watt LED fitting=19 nos
·Surface mounted LED fitting 12 watt =33 nos
·Geyser 15 ltrs capacity, ‘Bajaj’ make =1 no
·Ceiling fan 1200mm sweep=12 nos
·Exhaust fan ,380 mm, CG make =3 nos
13.Provision of local power supply in the following manned L.C. Gate for reliability of power supply.
Ø72/E- in between Bahadurpur- Dhubulia Railway Station.
Ø54/E-in between Pyradanga-Ranaghat RailwayStation.
Ø65/E- in between Badukulla-JalalkhaliRailway Station.
Ø70/E- in between Krishnagar city Jn -Bahadarpur Railway.
Ø66/E- in between Jalalkhali- Krishnagar city Jn.
14.Provision of 34nos 30 amp RDSO Panel, in place of manual changeover switch at different LC gate for reliability of power supply.
15.Installation and commissioning of one no 20 mtr high polygonal high mast tower with the provision of six nos 200 watt LED flood light fittingat Diesel shed near ART at Sealdah yard.
16.Electrification of following newly constructed service building:-
ØCloak room and RMS office at Sealdah Raiway station
Øsouth crew booking lobby at Sealdah Raiway station
ØParcel cash counter at Sealdah Raiway station
ØStation director chamber at Sealdah Railway station.
ØTTE rest room on 2ndfloor at Sealdah Railway station.
ØVIP Lounge in 1st floor of B.R. Singh Hospital
ØZonal training centre at Kancharapara Railway station
ØBooking office at Bagula Railway station.
ØBooking office at Bamonghachi Railway Station.
ØBooking office at Subhasgram Railway Station
ØPI CabinBagula Railway Station.
ØPF shed on pf no-1; 2+3 and 4+5 Barasat Railway station.
ØPF shed on pf no-2 at BiraRailway station.
17.Electrification of newly constructed sub way at:-
ØBelghoria Railway station.
ØBarasat Railway station.
18.Provision of one no submersible pump of capacity 1000 gph,150 feet head ,1.1 HP,KSB make in newly constructed well of size4″X3″ at Satberia Railway Station.
19.Installation of one submersible pump of capacity 10000 gph at 180 feet head, 15HP,’KSB’make in newly constructed boring of size 8''x12'' at Narkeldanga Railway colony.
20.Installation of submersible pump of capacity 5000 GPH x 150 ft. head complete with Motor of cap. 7.5 HP in newly sunk deep tube well of size 150mmx 200 mm at Jadavpur and 47m x 6 CMH at total head of 25m, HP - 1.0 in newly sunk deep tube well of size 50mm x 100mm Kalikapur Railway Station.
21.Total 520 nos unauthorized tapping removed as a measure of energy conservation.
22.Replacement of 108 ( one hundred eightnos) nos heavy duty high wattage ceiling fans by light weight low wattage ceiling fans.
23.Twenty one nos. Conventional energy meter have been replaced with Digital type energy meter as a measure of energy conservation.
Achievements during 2020-21(up to November’2020)
ØInstallation and commissioning of two nos elevator of capacity 10 passengers, G+3, ‘’Johnson’’ make for Crew/Guards near South Booking office at Sealdah Railway station.
ØElectrification of newly constructed Booking at the following Railway Station:-
·Mallickpur Railway Station
·HabibpurRailway Station.
·Jaynagar MajilpurRailway Station.
·Bankimnagar Railway Station.
·Panchbera Railway Station.
·Taraknagar Railway Station.
·Bathnakritibas Railway Station.
ØProvision of 21 (twenty one) nos star rated AC machines in place of conventional AC machine at different locations.
ØProvision of 9 nos star rated AC machines at different locations.
ØAir conditioning of B.C Roy Auditorium at SDAH. Stage lighting, façade lighting and general lighting done at B.C Roy Auditorium at SDAH.
ØAir conditioning of all Running Rooms over SDAH Division.
ØProvision of one no submersible pump of capacity 5000 gph at 150 feet head, ‘’KSB’’ make in newly constructed deep tube well of size 200mmx150mm at Namkhana Railway Station.
ØProvision of eight nos HVLS fan at SDAH station.
ØProvision of ten nos RDSO panel in different LC gates for better reliability of power supply.
ØInstallation and commissioning of Centralised AC in Nephrology ward in BRSH of 24 HP withHEPA filter and all new wiring and fittings including Fan and Light within a month time and handed over on 15 July.
ØInstallation and commissioning of Centralised AC in ICU/S in BRSH now Covid -19 ward of 32 HP with with the facility of HEPA filter, UV filter, fresh air provision and all new wiring and fittings including Fan and Light within record time of 10 days.Installation and commissioning of Solar water Heater in BRSH in metro building of 3500lts/hrs capacity Which will cater the load of entire building and kitchen.
ØElectrification of renovated Staff canteen (Santusthi) at Old Koilaghat Building.
ØDISCOM authority energy meter shifted from old Booking office to New Booking oat Subhasgram and Mallickpur Railway station.
ØInstallation of two nos escalator of capacity 9000 persons per hour at Sealdah Railway station.
ØReplacement of 27 (twenty sevennos) nos heavy duty high wattage ceiling fans by light weight low wattage ceiling fans.
ØNew wiring and air-conditioning of newly constructed seminar hall in Engineering department of DRM Building.
ØProvision of twenty three nos pre paid energy meter of capacity 5-60 Amp, ‘Secure’ make in place of conventional energy meter in different stalls (outsider) at Sealdah Railway Station.
ØProvision of local power supply (single phase,230 vollt,2 KW ) in the following L.C gate:-
ØE/49 in between Karanjali-Nischindapur Market Railway Station.
ØE/42 in between Kulpi- Karanjali Railway Station
ØE/23 in between Jaynagar Majilpur- Mathurapur Road Railway Station.
ØT/20 in between Baruipur- Mallickpur Railway Station
ØE/23 in between Baruipur-Kalyanpur Railway Station.
ØE/11 in between Gocharan-Hogla Railway Station
ØT/13 in between Dakshin Barasat-Kalyanpur Railway Station
ØElectrification of newly constructed Toilet at Bankimnagar & Panchbera Railway Station.
ØElectrification of newly constructed Gang Hut at Bankimnagar , Taraknagar & MayurhatRailway Station.
ØProvision of eleven nos GI tubular pole of 5.5 mtr long with 45 watt LED outdoor fitting in place of defective MS tubular pole on pf no-2 at Shasan Road Railway station.
ØProvision of ten nos GI octagonal pole, 5.5 mtr high, in place of seven nos MS tubular pole and three nos rail pole with the provision of 45 watt LED outdoor fitting on pf no-5 at Sealdah Railway Station.
ØProvision of 70%-30% lighting arrangement at Ichhapur, Sonarpur, Gocharan, Sodepur, Agarpur, Belghoria, Ghutiarisharrff, Kalinarayanpur and Bidyadharpur Railway Station.
COACHING WING
COACHING WING ASSETS Assets of Coaching wing (AC) Sl. No. | Type of Coach | Total Holding | SDAH | CP | Total | 1 | WGFAC | 4 | 1 | 5 | 2 | WGFACCW | 8 | 0 | 8 | 3 | WGACCW | 37 | 6 | 43 | 4 | WGACCN | 81 | 40 | 121 | 5 | WGCWNAC | 0 | 10 | 10 | 6 | WGSCZAC | 5 | 9 | 14 | 7 | LWLRRM | 28 | 16 | 44 | 8 | LWFAC | 10 | 5 | 15 | 9 | LWFCWAC | 4 | 3 | 7 | 10 | LWCBAC | 11 | 3 | 14 | 11 | LWACCW | 31 | 9 | 40 | 12 | LWACCN | 129 | 37 | 166 | 13 | LSCZAC | 0 | 6 | 6 | 14 | WRRMDAC | 0 | 4 | 4 | 15 | WACCNH1 | 0 | 11 | 11 | Total | 348 | 160 | 508 | Assets of Coaching wing (Non AC) Sl. No. | Type of Coach | Total Holding | SDAH | CP | Total | 1 | GSCN | 241 | 129 | 370 | 2 | GS | 208 | 113 | 311 | 3 | GSCZ | 44 | 39 | 83 | 4 | SLR/SLRD | 87 | 47 | 134 | 5 | WCB | 0 | 7 | 7 | 6 | FC | 0 | 0 | 0 | 7 | PPS | 0 | 4 | 4 | 8 | YZZS | 3 | 0 | 3 | 9 | YS | 11 | 0 | 11 | 10 | LSCN | 33 | 65 | 98 | 11 | LS | 15 | 23 | 38 | 12 | LSLRD | 2 | 0 | 2 | 13 | VP | 1 | 0 | 1 | Total | 635 | 427 | 1062 |
ØPower car holding LHB type Power car: 44 nos. ICF type Power car: 4 nos. Cummins make engine: 65 nos. Cummins make engine: 8 nos. Greaves Cotton make engine: 21 nos. Kirloskar make engine: 2 nos. TL & AC Activity Centers & Trains in brief ØActivity centres: 1.1. Primary Depot 1: Sealdah (NCC yard,NSS yard, Sick line & Platform) 1.2. Primary Depot 2: Chitpur (Maintenance yard, Sickline and Platform) 1.3. Secondary attention at Berhampore Court. ØScheduled Mail / Express Trains at depots Depots | Primary trains | Primary rakes | Secondary trains | Secondary rakes | Sealdah | 23 | 40 | 2 | 4 | Chitpur | 25 | 25 | 9 | 11 | Total (Div) | 48 | 65 | 11 | 15 | Achievement during 2019-2020 · ZERO non AC case en-route during 2019-20 · HOG CONVERSION OF TRAINS 11 LHB trains, (8 rakes) overhauled by Electric LOCO have been converted to run in HOG mode. · PUSH PULL MODIFICATION Successful trial run in Push Pull mode (with existing control cable of S&T dept) of Rajdhani rake from SDAH to RHA has been carried out on 02.08.19. Push pull modification of Rajdhani Rakes In first phase, vide contractual agreement through LOA no. ELEG/OT/742R/2019-20, Dt. 25.10.19, M/s Contact Consotium has modified of 49nos. coaches & Power cars to run 2 nos. Rajdhani rakes in Push Pull mode. · Extra Coach Movement - 1736 nos. AC and 1130 non AC coaches were in service to clear extra rush. | - 14 Nos AC coaches and 21 nos TL coaches have been augmented on permanent basis with primary trains of SDAH & CP depot. |
Achievements (April’2020 to Nov’2020) · Both rakes of Padatik Express have been converted to HOG compliant and running in HOG mode since 07.06.2020. ·Both rakes of Darjeeling mail have been converted to HOG compliant and running in HOG mode since 20.10.2020 as 02343/44 SDAH- NJP Festival special. · HOG modification of all LHB power cars and Coaches has been completed. Conversion of ICF manufactured KOAA - PNBE Garib Rath Power cars and coaches are in the verge of completion. · Service of 02021/02 SDAH – BBS Covid special has been started with single Power car and one LSLRD from 14.08.2020. ·HOG Implementation in scheduled trains & calculated savings of HSD oil due to HOG service Sl. No. | Primary Train No. | Train Name | OHE Electri-fication Status | HOG Operation in between | HOG done on | Round trip duration in HOG mode | Trip per year | Fuel saving on HOG/ trip | Fuel savings/ year (in Ltr) | 1 | 12313/ 12314 | Rajdhani Exp | Fully | SDAH - NDLS | 25.11.16 | 35:30:00 | 365 | 4115.8 | 1502279 | 2 | 12259/ 12260 | Duronto Exp. | Partly | SDAH - NDLS | 17.12.17 | 34:05:00 | 208 | 4163.5 | 866008 | 3 | 12329/ 12330 | WB S K Exp. | Fully | SDAH- DLI | 12.09.19 | 45:05:00 | 52 | 5461.1 | 283978.9 | 4 | 12379/ 12380 | Jalianwalabag Exp. | Fully | SDAH- ASR | 06.09.19 | 61:10:00 | 52 | 7133.5 | 370942 | 5 | 22323/ 22324 | Shabdabhedi Exp. | Fully | KOAA- GCT | 14.02.20 | 27:25:00 | 52 | 3287.2 | 170932.7 | 6 | 13121/ 13122 | KOAA - GCT Weekly Exp. | Fully | KOAA- GCT | 16.02.20 | 29:30:00 | 52 | 3444.8 | 179131.3 | 7 | 12315/ 12316 | Ananya Exp. | Partly | KOAA- SWM | 26.12.19 | 53:30:00 | 52 | 6649.5 | 345774 | 8 | 12317/ 12318 | Akal Takht Exp. | Fully | KOAA- ASR | 22.12.19 | 67:00:00 | 104 | 7734.8 | 804422.7 | 9 | 12357/ 12358 | Durgiana Exp. | Fully | KOAA- ASR | 07.01.20 01.02.20 | 58:50:00 | 104 | 3470.5 | 360932 | 10 | 12319/ 12320 | Kolkata Agra Exp. | Partly | KOAA- DDU | 19.02.20 | 20:12:00 | 52 | 1379.6 | 71738.33 | 11 | 13135/ 13136 | Joynagar Exp. | Partly | KOAA - BJU | 22.02.20 | 20:55:00 | 52 | 1439.2 | 74836.67 | 12 | 12377/ 12378 | Padatik Exp | Partly | SDAH - NJP | 08.07.20 | 19:45:00 | 365 | 2350.3 | 857871.7 | 13 | 22317/ 22318 | Humsafar Express | Fully | SDAH - JAT | 31.12.18 | 69:00:00 | 52 | 7656.0 | 398112 | 14 | 22201/ 22202 | Puri Duranta | Fully | SDAH - PURI | 06.09.19 | 17:30:00 | 156 | 1037.7 | 161876 | 15 | 13167/ 13168 | KOAA- Agra Cant Exp. | Partly | KOAA - DDU | 19.03.20 | 22:07:00 | 52 | 1494.2 | 77696.67 | |
|
|
|
|
|
|
|
|
|
|
|
Phase wise Special trains offered for passengers during Covid-19 pandemic situation |
|