Good Work

GOOD WORK FOR THE YEAR 2021 - 2022

Electrification

ØElectrification of Bhattanagar (Excl.)-Baltikuri (Excl.) (2.7 RKM/2.43TKM) completed on 03.11.2021

ØKanrnasubarna (Excl.) to Khagraghat Road (Excl.) completed on 10.03.2022

ØElectrification of Tribeni Tissuesiding on 29/03/2022

ØKGLE TSS commissioned on 11/06/2021

 

 Reliability Related Works

Ø137 Nos. leaning mast replaced in the previous Financial Year

Ø62 Tight Implanted masts replaced

Ø15.605 Km DC unregulated OHE converted to Conventional AC OHE

Ø06 nos. newly Isolators and section insulators are commission at NDAE, PSAE, PTAE, BSAE, SMAE and DTAE for segregation of Loop line from Main line for increasing reliability and block availability

Ø2.901 Km worn out contact wire replaced

Ø4.405Km Catenary with multiple splices replaced.

Ø05nos.underratedIsolator (800 AMP)replacedby1600AMP Isolator at BDC & BMG Loco Bay – I with 01 no. side earthing heal

Ø450 Meter steel catenary replaced by 107 Sq. mm new catenary wire at Jhill siding.

Ø12.5 MVA Traction Transformer POH under progress in DTAE/TSS first time in Eastern Railway.

Ø38% reduction of Asset Failure from the year 2019 – 20.

ØReturn Feeder 1 connection with New Burried Rail has done at BEQ/FP.

ØMelted connector of TR-1 Burried Rail replaced by new at DKAE/TSS.

Ø02 Nos. TSS at BMAE & BWN, 04 Nos. SSP, 02 Nos. SP land availability has been approved by Divisional level for 160 KMPH power supply related work.

Other Safety work:-

Ø15 nos. OHE slewing work has been carried out by the division in KWAE – AZ section, BDC – KWAE section and KAN – PKR section to assist Engineering department for Bridge girder erection, LHSand FOB work as well as availed shadow block for liquidation of overdue assets.

 

Staff Related Issues

ØChange of designation of BD Van driver to technician.

ØOutsourcings of PSI activities in BDC -KWAE- AZ, and BWN-KWAE, KAN-PKR-GMAN, NHT-AZ and RPH-DUMK Sections started.

 

Cost Saving Measures

ØReduction in TA with respect to previous year by 5% .

ØPakur TSS under open access mode from 14.05.21.

Ø66.32% reduction of OT with compared to previous year.

 

 160Kmph work

Ø78.159 TKM (66 nos. Tension length) 160 KMPH OHE modification done in HBC section.

 

Scrap Sale

Ø349.38 Metric Ton Ferrous and 60.90Metric Ton Non-Ferrous Scrap materials deposited during this financial year 2021-22.

 

Works

ØCapital expenditure of Rs 13.91 Crore against Budget grant of Rs10.83 Crores

Ø1 Pink Book Work and 2 Law Book work physically completed in the year 2021-22

 





Source : Eastern Railway CMS Team Last Reviewed : 27-09-2022  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.