Main Activities of LHB Section 1) POH of coaches: AC and Non-AC including new generation coaches viz.LHB, Hybrid, Double Decker.
2) Intermediate Overhaul (IOH) of LHB,Hybrid,Doubledeker, Shatabdi and other 18 Month Mail / Express coaches.
3) Supply of IOHed ICF & LHB Coach Bogies to ECR.
4) Refurbishing of coaches both AC & Non AC.
5) Retrofitment of Environment friendly Bio-Toilet in Coaches.
6) Bogie Frame for LHB Coaches.
7) Fire Detection and Supression System in Pantry and Power Car.
8) Conversion of Camping Coaches (RCC).
9) Ventury fitment in Coach Toilet for ICF/NAC Coaches.
10) Utkrist coaches outturn achieved its target.
11) Upgraded LHB/NAC LS-3 to LS-5 with “FIBA” device installed.
12) Conversion of Deck Coach for Traction department to maintain and repair of overhead traction line.
Special Activities during Lockdown Period for COVID-19 1) This Workshop turned out 121 nos. Isolation Coaches for COVID-19.
2) Face Mask produced in house in LLH Shop.
3) Paramedic Suits produced in house in LLH Workshop.
4) Coverall (with QR code) made by this Workshop.
Year: 2019 - 20 LHB ICF Total AC NAC AC NAC Total 300.0 214.0 445.0 1458.0 2417.0 Avg./Month 25.00 17.83 37.08 121.50 201.42
Year: 2020 - 21 # LHB ICF Total AC NAC AC NAC Total 219 228 317 1088 1852 Average / Month 18.25 19.00 26.42 90.67 154.33
Year: 2021 - 22 # LHB ICF Total AC NAC AC NAC Total 289.0 279.0 324.0 1113.0 2005.0 Avg./Month 24.08 23.25 27.00 92.75 167.08
# Total Working Days and outturn hampered due to frequent Lockdown for COVID-19.
Year: 2022 - 23 LHB ICF Total Month AC NAC AC NAC April, 2022 49 13 20 108 190 Total 49 13 20 108 190 Average / Month 49.08 13.00 20.00 108.00 190.00