About Us
   Workshop
      LILUAH
         Department
            Mechanical
               Manufacturing


 
Bookmark Mail this page Print this page
QUICK LINKS
Manufacturing



Manufacturing Organisation

Shri Kaushik Dutta, Dy. Chief Mechanical Engineer (M), assisted by AWM/Plant, AWM/Wheel & AEN/ WS.

Shri Sumanta Atta, AWM (P) & Shri Rinku Gupta, AWM (Wheel) looking after Repair & maintenance complete workshop’s M&P (Millwright), K-Shop, E-Shop, C-Shop , M&P & PH works and assists APS in housekeeping.

Shri Saraj Bag, AEN/WS looking after civil engineering work of whole workshop.

Main Activities

Section Activity
K Shop Complete Overhauling of Wheels of ICF Coach, LHB Coach & Wagon.
ICF Bearing Overhauling.
C Shop Overhauling of Freight CTRB.
Repairing of Body Side Door.
Repairing, polishing of SS wall protector, SS wash basin.
Manufacturing of FRP items of coaches (Litter Bin, Waste Bin etc).
Powder coating of amenities items of coach, watering of coaches.
E Shop POH & IOH Activities of LHB & ICF Spring.
POH activities of Wagon Spring.
H Shop Maintenance activities of various machinery & plants of workshop.
Maintaining of Fire Extinguishers.
M & P Workshop modernization project.
Procurement process of M&P through COFMOW, COS/KKK, Dy. CMM/LLH.
Condemnation process of M&P.

OUTTURN AT A GLANCE

WHEEL SET SUPPLY:

YEAR SHOP DIVISION Grand Total
ICF LHB WAGON TOTAL ICF LHB WAGON TOTAL
2019-20 13264 4156 5176 22596 2729 639 69 3437 26033
2020-21 9992 4624 4260 18876 509 177 79 765 19641

Note: 435 Nos. contaminated water logged ICF Wheel Set have been cleaned and re-greased by LLH/WS, which is a Good Work done during May-June 2020.


2021-22 SHOP DIVISION Grand Total
ICF LHB WAGON TOTAL ICF LHB WAGON TOTAL
Apr-2021 1044 512 600 2156 42 13 8 63 2219
May-2021 484 352 152 988 54 7 4 65 1053
Jun-2021 400 462 308 1170 62 NIL NIL 62 1232
Jul-2021 880 682 468 2030 58 11 8 77 2107
Aug-2021 876 588 448 1912 57 16 12 85 1997


SPRING SUPPLY:

PERIOD ICF SPRING LHB SPRING
ICF TOTAL SUPPLY TO SHOP IN VU AVG SUPPLY
VU/MONTH
REJECTION
% AVERAGE
LHB TOTAL SUPPLY TO SHOP IN VU AVG SUPPLY
VU/MONTH
REJECTION
% AVERAGE
SUPPLY TO DIVISION
2019 - 20 3573 298 5.58 1057 88 3.625 56
2020 - 21 2384 198.66 7.23 1175 97.92 4.20 NIL
APR-2021 243 170.6 6.84 141 131.8 9.42 NIL
MAY-2021 131 4.68 87 3.57 NIL
JUN-2021 105 2.89 104 2.78 NIL
JUL-2021 195 4.76 168 5.65 NIL
AUG-2021 179 7.74 159 6.88 129


WAGON CTRB SUPPLY:

PERIOD SHOP DIVISION TOTAL
2019-20 10557 Nos 9385 Nos 19942 Nos
2020-21 8724 Nos 8367 Nos 17091 Nos
APRIL-2021 1175 Nos 700 Nos 1875 Nos
MAY-2021 384 Nos 496 Nos 880 Nos
JUNE-2021 530 Nos 442 Nos 972 Nos
JULY-2021 993 Nos 361 Nos 1354 Nos
AUGUST-2021 944 Nos 375 Nos 1319 Nos




Source : Eastern Railway CMS Team Last Reviewed on: 01-09-2021  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.