GOOD WORKS FOR THE MONTH OF OCTOBER 2021



  • राजभाषा पखवाड़ा के दौरान आयोजित कुल 06 हिन्दी प्रतियोगिताएं निबंध प्रतियोगिता, वाक प्रतियोगिता, टिप्पण एवं आलेखन प्रतियोगिता, कहानी पूरी करो, शब्द संयोजन एवं कंप्यूटर पर हिन्दी टंकण प्रतियोगिता में कुल 24 कर्मी सफल हुए तथा इन्हें इस माह के 27/10/2021 27/10/2021 को मुख्य कारखाना प्रबंधक द्वारा पुरस्कृत किया गया ।
  • राजभाषा विभाग द्वारा इसी माह वायस टाइपिंग विषय पर एक तकनीकी संगोष्ठी भी आयोजित की गई ।
  • RajVasa1
    RajVasa2

  • Observance of Vigilance Awareness Week-2021: Vigilance Awareness Week-2021 was observed from 26/10/21 to 01/11/21 with full vigour and enthusiasm. Officers and Staffs participated in various activities like Seminar on Independent India@75:Self-reliance with Integrity, Speech on Awareness amongst Officers and Staff keeping focus on vigilance view point, Nukkad Natak and Quiz Contest were undertaken as a part of Vigilance Awareness Week.
  • VigAwr1
    VigAwr2

  • Seminar on “Independent India@75:Self-reliance with Integrity”
  • India75a
    India75b

  • Quiz Contest:
  • Quiz1
    Quiz2

  • “Nukkad Natak” performed by Bharat Scouts and Guides/Liluah:
  • Natak1
    Natak2

  • National Unity Day: National Unity Day was celebrated in the Workshop. Officers, Staffs and School Students participated in the occasion.
  • Unity1
    Unity2

  • Pledge taken on National Unity Day
  • Pledge1
    Pledge2

  • "RUN FOR UNITY" programme held on the occasion of National Unity Day at Liluah Workshop
  • Unity1
    Unity2

  • Commissioning of AJTB Lathe: CNC based Universal Axle Journal Turning & Burnishing Lathe as per Spec. No. COFMOW/IR/MT/CNC AJTB/BG/2020 successfully commissioned in Wheel Shop has brought a major boost in the quality of axle journal polishing and thereby improving the quality of the final product.
  • AJTB Lathe

  • Annexation of BIJLI Quarter area: Land area of 13,134 sqm. has been annexed with C&W workshop Liluah which consists of 02 Nos. of abandoned 04 storey building and underground pipeline for drinking water supply to LCD, Belur Scrap Yard, Khari line Barrack & Belur railway station runs through this piece of land. Also part of the drainage line is running between workshop boundary & said land. The requisition of CWM/LLH workshop has been approved by DRM/Howrah. The above mentioned land along with all moveable and immovable structures has been handed over to CWM/C&W Workshop/LLH vide DRM’s L.No. License/RLDA/MC dated 11.10.2021
  • AJTB Lathe

  • Starting of Phosphating operation of coaching items in existing Phosphating plant of spring shop in addition to coaching work load of phosphating of spring. This has resulted in savings and improvement of quality of product by making it corrosion resistant.
  • Phosphating1
    Phosphating2

  • A HVLS fan has been installed at T-shop on trial basis to mitigate the unusual flow of air in the shop. This is an amenity to staff for fresh air and cool environment during working.
  • HVLS Pic

  • A DG set of capacity 63 KVA has been installed at Officer’s club for standby power supply.
  • DG Set

  • USB points in ICF type AC coaches are being provided in addition to existing mobile charging points. Total charging points now equalizeto total no. of berths in AC coaches. Till now 17 nos. of coaches completed. The provision of USB points has eased passengersto not carry charger.
  • USB Point Pic

  • This month 03 nos. camping coaches (ER 00304-WGSCN conv. to ER 002304-RCC, ER 99273-WGSCN conv. to ER 99273-RCC & ER 98312-WGSCN conv. to ER 98312-RCC) have been converted and turned out from LLH. (Cumulative for this FY-11 nos.).
  • Camping Coach Pic1
    Camping Coach Pic2

  • This month 01 no. LHB/NAC LS-3 coach (ER 15453) has been upgraded to LS-5 coach with “FIBA” device installed in LLH. 100% conversion work from LS-3 to LS-5 has been completed during this month. (Cumulative for this FY-07 nos.)
  • LS Pic1
    LS Pic2

  • The installation work of Fire Detection & Suppression System in LHB Power & Pantry Car coaches started in Liluah Workshop. During this month, 02 nos. (LHB/AC) fitted with this system. {Cumulative: LHB/AC-134, LHB Power Car-55 (Power Car Works comp.) & Pantry-51 nos.}
  • Fire Detection Pic1
    Fire Detection Pic2

  • Savings on account of installed Solar PV modules for the month of October,2021.
  • Total savings of Rs. 5,51,546.80/- have been achieved for the month of October, 2021 for the installed (1.5 MWp and 9.7 KWp) solar PV modules of Liluah Workshop.
  • Environmental initiatives during October, 2021

  • 61 energy saving BLDC fans were fitted in FSS & CSS-ii area. 40 energy saving LED Tube Lights were fitted in various shops and buildings.
  • 06 nos Flood Light. of 150 Watts fitted at Crane, FSS and CSS area.
  • 04 nos Street Light of 30 Watts fitted at Town Supply area.
  • UMID [Position as on 31-10-2021]

  • Total Strength Registered Users Applications pending with Employee Applications pending with Administration Cards Generated Cards Generated % on total registered Cards Generated % on total strength
    7403 7316 52 6 7258 99.20% 98.04%

  • HRMS [Position as on 31-10-2021]


  • Total Strength
    Employee Master e-SR
    Combined Progress %
    Count %age Count %age
    7399 7344 99.26% 7323 98.97% 99.12%

  • e-Pass [as on 31-10-2021]

  • Total No. of e-Pass applications received in October 2021. Total No. of e-Pass issued in October 2021. % of e-Pass generated
    2643 2643 100%

  • e-Office Orders [as on 31-10-2021]

  • Total No. of Office Order issued during the month of October 2021 No. of e-Office Order issued % age of e-Office Order generated
    51 51 100%

  • Settlement through HRMS [as on 31-10-2021]

  • Total No. of Settlement Cases processed during the month of October-21 Total No. of Settlement Cases Processed through HRMS during the month of October-21 % age of Settlement processed through HRMS
    33 33 100%




    Source : Eastern Railway CMS Team Last Reviewed : 05-11-2021  


      Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

    © 2016  All Rights Reserved.

    This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.