Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter View Content in Hindi
National Emblem of India

About Us

Divisions

News & Updates

Tenders

Supplier Information

Passenger information

Contact Us

Divisions
   MALDA
      Departments
         Electrical.
            Electrical TRD


Goto Yahoo!!


 
Bookmark Mail this page Print this page
QUICK LINKS
Electrical TRD



TRACTION DISTRIBUTION

MALDA DIVISION

EASTERN RAILWAY

TRACTION DISTRIBUTION DEPARTMENT in Malda Division came into existence after 1stintroduction of Goods & Passenger Services under electric traction in Malda – Gumani section after successful inspection of CRS /EC in 30.09.2018. As on date this department is responsible for maintenance of 1032 TKM of electrified section including 04 nos. electrified private sidings viz. NTPC Farakka Thermal Power Station, Ambuja Cement Siding, WBPDCL Sagardighi Thermal Power Plant & Sonar Bangla Cement siding with an asset of 06 OHE cum PSI depot, 05 Traction Sub Station (02 commissioned & 03 on back charge), 25 nos. SSP & 9 nos. SP. Traction power supply over entire division is controlled through SCADA from a single Remote Control Centre at Malda.

TRACTION DISTRIBUTION department is responsible for maintenance & operation of Overhead equipments, Power supply installations, Substation Installations & remote control to supply necessary electric power to Electric Locomotive/MEMU.


        

SANJEET KUMAR ANUJ

Senior Divisional Electrical Engineer (Traction Distribution)

MOB (O): 9002024330       Email: srdeetrdmldt@gmail.com

Job Profile 

Senior Divisional Electrical Engineer (Traction Distribution), Malda is the Officer in immediate charge of Traction Distribution of Malda Division, responsible for all technical and organizational matters connected with the efficient maintenance and operation of the Power Supply Installations (PSI), Over Head Equipment (OHE) and Remote Control Equipment (RC).

He is entrusted with :

* * General planning and supervision to ensure efficient and safe maintenance and operation of the Power Supply Installations and Over Head Equipment installations under his charge in accordance with prescribed schedules and regulations,

** Overall co-ordination at the divisional level with Operating and other departments to plan Power Blocks required for maintenance of Power Supply Installations and Over Head Equipment.

*Man-power planning for the department.

*Statistical analysis and compilation of details of all defects and failures.

*Liaison with power supply authorities for reliable Traction Power Supply.

*Scrutiny and passing of Traction Power Supply bills.

*Preparation of budget for Traction Distribution section and control over expenditure for operation and maintenance.

*Effective inspections of Traction Distribution installations.

*All  modification & construction work related to Traction Distribution installations.

SURAJ KUMAR, ADEE/TRD/MALDA

*  He is over all in charge of OHE cum PSI depot at Malda, Jangipur & Barharwa and RCC at Malda along with S&W and Drawings. He coordinates with depots / RCC under his control and assists Sr.DEE/TRD.

SANTOSH KUMAR, ADEE/TRD/JAMALPUR

*  He is over all in charge of OHE cum PSI depot at Jamalpur, Sabour & Sahibganj along with electrified sections of upcoming OHE /PSI Depot at Barahat and assists Sr.DEE/TRD.

 

Brief Description of TRD Assets

 

Traction Distribution organisation in Malda Division start off its journey in September 2018 with the commissioning offirst ever electrified section between Malda to Gumani (excluding) of 145 TKM.Now as on date this organisation is looking after of 1032 TKM and approximate 86 TKM section likely to be inducted shortly.

TRD assets in Malda Division stretched over three states viz. West Bengal, Jharkhand & Bihar and share Zonal Border with North East Frontier Railway at Malda and with East Central Railway at Kiul & Munger.Divisional boundary lies in Bonidanga – Gumani & Azimaganj – Poradanga with Howrah Division and in Banka – Kakwara section with Asansol Division.

Power Supply to OHE assets over three States is being taken from WBSEDCL for sections within jurisdiction of WB, from JUSNL for sections within Jharkhand and from BSPTCL for sections in state of Bihar.


SPECIAL OHE ASSETS  

*Electrified rail route on Farakka Barrage

It is a 2.69 Km long barrage over river Ganga in New Farakka – Chamagram section of Malda Division. It has special type 11.00 M long Bolted Mast on its 53 nos. pier out of total 109 nos. pier cumulating 106 nos. mast for both UP & DN line. A special earthing arrangement of steel barrage structure has been done for safe operation of 2.69 Km long barrage running parallel to OHE.

                   

*     

Electrified section through tunnel in Patam (H) – Jamalpur section

The only tunnel in Eastern Railway exist in Malda Division in Patam (H) to Jamalpur section. Electrified Single line is being presently operated through this tunnel. A new tunnel for doubling purpose is under construction. Five nos. special mast of length 6.00 M has been provided with bolting arrangement inside the 275.3 M long tunnel for OHE arrangement having contact wire height of 4800 mm with the minimum restricted clearance of 6200 inside tunnel.

                     


TRACTION DISTRIBUTION/ MALDA AT A GLANCE


*Details of commissioning of section

SN

SECTION

RKM

TKM

CRS AUTH.

Date

1

Ex Gumani - Malda

51.146

145.485

30.09.2018

2

Azimganj  - Manigram

(incl. AZ by-pass line at PRDG)

20.192

51.163

11.03.2019

3

Kiul – Bhagalpur

98.474

255.302

20.03.2019

4

Bonidanga LC -  Tinpahar & Bonidanga – Barharwa

25.99

73.58

30.03.2019

5

Tinpahar – Sahibganj

38.315

108.342

09.09.2019

6

Tinpahar - Rajmahal

11.541

13.055

17.11.2019

7

Jamalpur – Munger

7.004

9.905

17.11.2019

8

Sahibganj – Shivanarayanpur

35.418

82.524

10.03.2020

9

Shivanarayanpur – Bhagalpur

39.009

93.778

02.07.2020

10

Manigram (excl.) – Nimtita(Incl.) incl. Sonar Bangla cement siding (7.2 TKM)

33.987

72.682

16.12.2020

11

Nimtita – New Farakka (Excl.)

21.903

36.752

13.02.2021

12

Bhagalpur(Excl.) – Banka (Incl.)

53.744

68.412

19.03.2021

13.

Barahat (Excl.) – Dumka (Excl.)

SIDINGS

Commissioned on

Sagardighi Thermal Power Plant

11.4

19.06.2020

NTPC Farakka Siding

7.1

17.04.2019

Ambuja Cement Siding

3.5

08.11.2019

436.753

1032.98

 

*Details of Assets on hand

SN

Item/ Assets

Quantity / Holdings

1

Electrified Route Kilometre

436.753

2.

Electrified Track Kilometre

1032.980

3.

132 kV /25 kV Traction Sub-Station (Commissioned)

02 Nos. (Karamtola under Open Access & Jangipur under Consumer Mode)

4.

132 kV /25 kV Traction Sub-Station (Back Charged)

03 Nos. (Jamalpur, Sabour, Dhamdhamia)

5.

132 kV /25 kV Traction Sub-Station (Under Construction)

02 Nos. (Jamirghata, Banka)

6.

OHE cum PSI Depot

(Functioning)

06 Nos. (Malda, Barharwa, Sahibganj, Sabour, Jamalpur, Jangipur )

7.

Switching Post (SSP)

25 Nos.

8.

Switching Post (SP)

09 Nos.

9.

Switching Post (under construction)

03 Nos.

(Ahiran SSP, Mahipal Rd SSP & Tildanga SS)

10.

OHE cum PSI Depot

(Under construction)

01 (Barahat)

11.

TW Shed (commissioned)

02 Nos. (Jamalpur, Sahibganj)

12.

TW Shed (Not commissioned)

04 Nos. (Sabour, Barharwa, Malda, Jangipur)

13.

TW Shed (under construction)

01 No. (Barahat)

14.

Other TRD assets

Traction Power Control (TPC) at Malda

Remote Control Centre (RCC) at Malda

15.

Tower Wagon

06 Nos.

(8 Wheeler – 04 Nos.)

(4 Wheeler – 02 Nos.)

16.

Electrical Over Head Crossings

51 Nos.

33 kV – 04 Nos.

66 kV – 03 Nos.

132 kV – 26 Nos.

220 kV – 02 Nos.

400 kV – 16 Nos.

*Details of Traction Sub Stations

SN

Name of TSS

Rating / Capacity of Transformer

Supply Authority

Transmission Line

Normal feeding Jurisdiction

1.

Jamalpur

21.6 MVA (02 Nos.) 132 /25 kV

BSPTCL

Under Construction

(3.0 Km OH +1 Km UG)

Rampur (H) SP to Sultanganj SP

2.

Sabour

21.6 MVA (01 Nos.) 132 /25 kV

BSPTCL

Ready but not commission

(3.0 Km UG)

Sultanganj SP to Bikramshila SP and Bhagalpur to Bhaglpur SP

3.

Karamtola

(comm..on 03.07.2020)

21.6 MVA (02 Nos.) 132 /25 kV

JUSNL

8 Km. OH

Bikramshila SP to Maharajpur SP

4.

Dhamdhamia

21.6 MVA (01 Nos.) 132 /25 kV

JUSNL

Under Construction

(17 km OH)

Maharajpur SP to Bonidanga SP, Barharwa to Gumani SP & Tinpahar to Rajmahal

 

 

SN

Name of TSS

Rating / Capacity of Transformer

Supply Authority

Transmission Line

Normal feeding Jurisdiction

5.

Jamighata

21.6 MVA (02 Nos.) 132 /25 kV

WBSEDCL

Under Construction

(02 km OH)

Malda SP to Bonidanga SP and New Farakka to Ballalpur SP

6.

Jangipur

(comm.. on 11.02.2021)

21.6 MVA (02 Nos.) 132 /25 kV

WBSEDCL

3.0 Km UG

Ballalpur SP to Poradanga SP and Poradanga to Gosingram N/S

7.

Banka

21.6 MVA (02 Nos.) 132 /25 kV

BSPTCL

Under Construction

29 Km. OH

Bhagalpur SP to Hansdia SP, Bharahat to Banka and Banka to Katoria SP (ASN Div)

*Details of Switching Stations

SN

Section

SP/SSP

1

KIUL – JAMALPUR

Rampur SP

2

Uren SSP

3

Abhaypur SSP

4

Dharhara SSP

5

JAMALPUR – BHAGALPUR

Rishikund SSP

6

Ganganiya SSP

7

Sultanganj SP

8

Akbarnagar SSP

9

Nathnagar SSP

10

BHAGALPUR – SAHIBGANJ

Ghoga SSP

11

Kahalgaon SSP

12

Bikramshila SP

13

Pirpainti SSP

14

Sahibganj SSP

15

SAHIBGANJ - BARHARWA

Maharajpur SP

16

Taljhari SSP

17

Tinpahar SSP

18

Barharwa SSP

19

JAMALPUR – MUNGER

Munger SSP

20

MALDA - BONIDANGA

Malda SP

21

Malda SSP

22

Gour Malda SSP

23

New Farakka SSP

24

Bonidanga SP

25

Tildanga SS

26

AZIMGANJ – NEW FARAKKA

Poradanga SP

27.

Mahipal Rd. SSP

28.

Manigram SSP

29.

Gankar SS

30.

Ahiron SSP

31.

Nimtita SSP

32.

Dhulianganga SSP

33.

Ballalpur SP

34.

BHAGALPUR – BANKA

Bhagalpur SP

35.

Bela SS

36.

Hatpurani SS

37.

Barahat SS

*Jurisdiction of OHE/PSI Depot

UNDER CONTROL OF ADEE/TRD/MALDA

Section

Depot

From

To

RKM

(Apprx)

TKM

(Apprx)

i) Malda 294/45-46) to PTFE at Maharajpur SP

ii) Ex. Azimganj City  (Km. 181) to PTFE at Ballalpur SP

Malda

294/45-46

PTFE (Incl.) at Bonidanga SP and PTFE (Excl.) at Ballalpur SP  including Ambuja Cement Siding (3.5 TKM) & NTPC Farakka Siding (7.1 TKM)

50

160

Jangipur

Ex Ajimganj City Km. 181 (Divisional Border)

PTFE (Incl.) at Ballalpur SP including SgTPPSdg. (11.4 TKM) & SBCS Sdg. (7.2 TKM)

71

177

Barharwa

i) Bonidanga SP (Excl. PTFE)

ii) Tinpahar

i)  Maharajpur SP (Inc. PTFE)

including Loc. No. 01/24, including  OHE span between 01/22 & 01/24

ii) Rajmahal

i)50

ii) 12

i)145

ii) 13

Total

183

504

 

UNDER CONTROL OF ADEE/TRD/JAMALPUR

Section

Depot

From

To

RKM

(Apprx)

TKM

(Apprx)

I) Maharajpur SP(Excl. PTFE) to Rampur Km. 401/41-42(Incl. PTFE)

ii) Bhagalpur SP (Icl. PTFE) to Tikani Loc. 16/21

Sahibganj

Maharajpur SP (Excl. PTFE)

Bikramshila SP (Incl. PTFE)

51

126

Sabour

i) Bikramshila SP (Excl. PTFE)

ii) Bhagalpur SP (Incl. PTFE) *

i) Sultanganj SP (Incl. PTFE)

ii) Banka Loc. 53/15

i) 62

ii) 54

i) 140

ii) 68

Jamalpur

i) Sultanganj SP (Excl. PTFE)

ii) Jamalpur TSS

ii) Rampur Km. 401/41-42 (Incl. PTFE)

ii) Munger Loc. 7/32 (Zonal Border)

i) 80

ii) 7

ii) 184

ii) 10

Total

254

528









Source : Eastern Railway CMS Team Last Reviewed : 29-07-2021  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.