Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter View Content in Hindi
National Emblem of India

About Us

Divisions

News & Updates

Tenders

Supplier Information

Passenger information

Contact Us

Divisions
   HOWRAH
      Departments
         Engineering
            Information


Goto Yahoo!!


 
Bookmark Mail this page Print this page
QUICK LINKS
Information

 Back to Engineering...

Progress Performance (2021-22) upto Nov’21

Sl

Item

Progress upto Nov

Target

2021-22

2020-21

2021-22

Current

Prev Year

Upto month

For the year

1

TRR(P) in TKM

44.76

37.50

47.05

70.57

2

TSR(P) in TKM

15.10

18.08

19.35

29.03

3

TRR(S) in TKM

6.44

2.06

3.82

5.73

4

TSR(S) in TKM

0.10

0.23

3.82

5.73

5

TTR Switch in Nos.

56

27

153

85

TTR X-ing in Nos.

91

67

57

100

6

Deep screening/TBR of turn outs(nos.)

68

66

88

125

7

Deep screening/TBR of Plain Tracks(km.)

59.94

114.61

160

240

8

Rectification of defective yard layouts.

a.

Layouts rectified (nos.)

2

2

0

0

b.

Yards completed (nos.)

1

1

2

3

9.1

Output of Plain Tamping Machine (TKm.).

1791.64

1151.75

1008

1512

9.2

Output of UNIMAT(Nos. of T.O).

695

645

567

850

Sl

Item

Progress upto Nov

Target

2021-22

2020-21

2021-22

Current

Prev Year

Current

Prev Year

10

Record by OMS – 2000 (Km).

1920

12085

11

Rail Weld failures.

11.1

Rail failures.

5

1

11.2

Weld failures.

3

2

11.3

Other failures.

0

0

11.4

Avoidable.

0

0

11.5

Total (Nos.)

8

3

12

Output of USFD machine(Km.)

2982.13

2918.49

2507

3760

13

Welding (No. of joints).

13.1

FBW – In Rly. Plants.

0

0

13.2

AT weld (No. of joints).

5155

5317

13.3

FBW – Mobile/ at site.(Tkm)

7.94

0

14

Rehabilitation of Bridges(Nos.)

0

1

15

Replacement of girder Bridges by ballasted deck.

0

0

16

Strengthening of major Bridge approaches(Nos.)

0

0

17

Scrap offered to stores (in MT).

6127

3507.29

7667

11500

18

Tree plantation (in Lakhs).

0.5570

0.05352

19.1

Toe Load Measurement of ERC (Km)

273.03

18

328

492

19.2

Painting of rail corrosion prone area (Km)

59.73

59.91

19.3

Greasing of ERC (Km.)

483.6

176.37

657

985

19.4

Sealing of liner contact area (Km.).

483.6

176.37

19.5

Shifting of liner contact area by distressing(Km.)

0

6.85

20

Construction of boundary wall(RM).

2404

3745

21.1

Provision of channel sleepers (nos.).

396

0

21.2

Provision of composite sleepers

0

0

733

1100

22

Formation treatment (Km.).

0.160

3.175

1.04

1.56

23

Destresing of LWR.

56.48

16.713

367

550




Source : Eastern Railway CMS Team Last Reviewed : 22-08-2022  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.