WELCOME
Electrical General Department
Eastern Railway, Sealdah
Organization Chart

Jurisdiction of Power wing
SDAH-I | SDAH-II | SPR | BT | NH | CP | RHA |
SDAH- Budge-Budge | DRM bulding officer colony, B.R .Singh Hospital | Ballygunge-Sonarpur | Bisharpara-Barasat | Belgharia- Kalyani | Kolkata Terminal-Princep Ghat | Madanpur-Ranaghat |
SDAH-Birati | NAP JJC BLVD GM Bunglow GHPR | Sonarpur-Canning | Barasat-Petrapol | | | Ranaghat-Gede |
SDAH-Majerhat | Burn standard, Behala Stadium | Sonarpur-Diamond Harbar | Barasat-Hasnabad | | | Ranaghat-Lalgola |
| | Baripur-Namkhana | | | | |
Assets of Electrical (Power wing)
Power Supply installation
WBSEDCL Supply points (HT) | 21 nos |
CESC supply points (HT) | 24 nos |
WBSEDCL Supply points (LT) | 420 nos |
CESC supply points (LT) | 87 nos |
Standby DG Sets | 25 nos |
Total no. of stations | 205 Nos |
Electrified stations | 205 Nos |
Non-Electrified station | NIL |
Other Asset
Lifts | 46 nos |
Escalator | 22 nos |
Major Building/Complex | 6 nos |
Electrified LC Gate | 414 nos |
Non-Electrified LC Gate | nil |
Central AC plant | 71 nos |
AC package Unit | 16 nos |
Window AC unit | 380 nos |
Split AC unit | 576 nos |
Tower AC | 6 nos |
Non-traction Energy Consumption & Bill pattern
Year | Consumption (MU) | Bill (Rs in Crore) |
2015-16 | 50.54 | 44.18 |
2016-17 | 48.26 | 40.67 |
2017-18 | 45.95 | 39.39 |
2018-19 | 42.35 | 37.16 |
2019-20 | 41.58 | 36.55 |
2020-21 | 33.25 | 29.64 |
2021-22 | 36.38 | 31.95 |
2022-23 | 40.27 | 35.22 |
2023-24 ( up to May’23) | 7.6 | 6.45 |
*Due to Covid Pandemic Non traction energy consumption of FY 2020-21 is very less compared to other years.Savings in FY 2021-22 compared to 2019-20: 12.5%
Savings in FY 2022-23 compared to 2019-20: 9.5%

Solar Plants in Sealdah Division :
Location | Capacity | D.O.I |
NKG RPF Barrack (PPP) | 31.68 kwp | 31.07.18 |
KOAA Terminal (PPP) | 468:66 kwp | 10.04.19 |
NH Station | 120kwp | 23.10.19 |
LKPR Running Room | 10 kWp | February, 2022 |
NMKA Running Room | 10 kWp | February, 2022 |
SDAH (Non-PPP) | 50 kWp | 31.03.22 |
SPR Carshed | 05kWp | February, 2022 |
Kakdwip | 05kWp | February, 2022 |
DDJ Running room | 05kWp | Dec’22 |
Total 705 kWp |


ACHIEVEMENTS 23-24(up to Aug'23)
ENERGY SAVINGS (NON TRACTION) :
Electrical General Department, Sealdah has increased Non-traction Energy Consumption by only 12.07% in comparison to 21-22 (up to May) irrespective of connected load increase on 17%.
Savings In Fuel: Fuel Savings by this department achieved is 4190 kL (Rs. 45 Cr. Appx.) through HOG operation during service and CSS operation during maintenance. as calculated upto May-2023
Solar Generation and Savings:Electrical General Department has achieved saving of Rs.16,25,600/- approximately as calculated upto July-2023
Domestic Load Segregation: has been done from industrial load introducing new HT supply connection of 250 kW from CESC.
Way Leave Charges.: Earned Rs.1,94,11,473/- upto July-2023 from different DISCOMs for track crossing.
Capacitor Bank at Majherhat:Successfully commissioned one new 175 KVAR capacitor bank at Majherhat Substation enabling savings Rs 60000/- per year as anticipated.
Implementation of Smart and Prepaid Metering System.-Smart Meter -249 numbers have been fitted at Moghal Bagan and Narkeldanga Railway Colonies, Sealdah and 33 numbers prepaid meters have been fitted for vendors upto Decmber-2022.
Implementation of Motion sensors in Platforms: Electrical General Department, Sealdah has successfully implemented motion sensor system for plat form light and fans at Kolkata Station PF#1 and Gede Station PF#1. Its anticipated cost savings will be Rs.3.0 lakh per year.
Implementation of Web Based monitoring system of Escalator: Web based monitoring system for 2 nos escalators at Naihati station and 2nos at Ranaghat station has been implemented as the first step towards complete automated monitoring of all lifts/escalators in the division.
Development of Power Supply System:
AT Barasat: Two (02) numbers Transformers of capacity 500 kVA each, 11 kV/415 V Dry Type (Make: Voltamp) commissioned for Coach Washing Plant Work
At Barrackpore: Transformer of 250 kVA capacity, 11kV/415V -01 no (Make: M/s Eastern Transformer) commissioned at Barrackpore Substatin.
Electrical Safety Audit:New Koilaghat Building (G+13) has been audited against its Electrical Safety aspect by Acredited Agency.
Development of Solar Plant with Monitoring System at Naihati:
Solar generation of 120 kWp Plant in Naihati Station has been provided with web based monitoring system enabling close vigil on its generation data day to day.
Electrical Work at Dumdum Running Room:
It has been provided with electrical items/equipments of power savings like Master Switches, LED lights, BLDC Fans, Solar Geysers, Solar generation Plant as a leap to meet the goal of ‘Green Initiatives’ towards making it ‘GreenBuilding’.
Renovation of RPF Barrack, Dumdum:
Renovation work of RPF Barrack Dumdum has been successfully done by providing every possible energy efficient electrical equipments like- BLDC Fans, Integrated Light LED Fittings, Surface wall mounted indoor LED Lights etc.
Provision of Pump at DRM Building for Monsoon
Two (02) number Dewatering Pumps (each15 HP-Make-Kirloskar) have been installed at DRM building Compound (DDJ End) in view of coping up with consequences of upcoming monsoon season.
New Substation:
One New Sub-stn. 6KV/415V has been installed at Narkeldanga Carshed with new CESC intake point with Contract Demand (CD ) of 220 KW comprising Equipments: HT VCB – 5 nos. (800A), LT panel 02 nos., Transformer 500 KVA 02 nos., APFC panel 150 KVAR – 01 no.