Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter View Content in Hindi
National Emblem of India

About Us

Divisions

News & Updates

Tenders

Supplier Information

Passenger information

Contact Us

Divisions
   SEALDAH
      Departments
         Electrical /Genl


Goto Yahoo!!


 
Bookmark Mail this page Print this page
QUICK LINKS
Electrical /Genl


 WELCOME

Electrical General Department

Eastern Railway, Sealdah



Organization Chart


Assets of Electrical (Power wing)
Power Supply installation

WBSEDCL Supply points (HT)

21 nos

CESC supply points (HT)

22 nos

WBSEDCL Supply points (LT)

350 nos

CESC supply points (LT)

86 nos

Standby DG Sets

27 nos

Total no. of stations

204 Nos

Electrified stations

204 Nos

Non-Electrified station

Nil

Other Asset

Electrified occupied Quarters

4284

Lifts

42 nos

Escalator

12 nos

Major Building/Complex

6 nos

Electrified LC Gate

410 nos

Non-Electrified LC Gate

nil

Central AC plant

71 nos

AC package Unit

16 nos

Window AC unit

380 nos

Split AC unit

576 nos

Tower AC

6 nos

Non-traction Energy Consumption & Billpattern

Year

Consumption (MU)

Bill (Rs in Crore)

2015-16

50.54

44.18

2016-17

48.26

40.67

2017-18

45.95

39.39

2018-19

42.35

37.16

2019-20

41.58

36.55

2019-20 (up to Feb’20)

38.92

34.08

2020-21 (up to Feb’21)

30.79

27.37


Achievements during 2020-21(uptoMarch’2021)

1.

1. Reduction in Non-traction energy consumption by 20.90 % in comparison to last year (Up to Feb ’20)

2. Reduction in Non-traction energy bill by 19.69 % in comparison to last year (Up to Feb’ 21).

3. Repair/Rehabilitation of electrical equipments, wiring, cabling etc at Beldanga, Lalgola, Krishnapur, Rejinagar and Sargachi due to damage on account of agitation against CAA on 15.12.2019.

4. Installation and commissioning of 2(two)nos elevator of capacity 10 passengers, G+3, ‘’Johnson’’ make near South Booking office at Sealdah Railway station.

5. Installation and commissioning of 1(One) no elevator of capacity 13 passengers, G+1, ‘’Johnson’’ make at Cossimbazar Railway station.

6. Installation of 2(two) nos escalator of capacity 9000 persons per hour,‘’Johnson’’ make at Sealdah Railway station.

7. Provision of 6 (six nos) HVLS (HIGH VOLUME LOW SPEED) fans with following specification in south passenger hall of Sealdah Railway station.


ØSpecification of HVLS fan:-

No of blades

Sweep

maximum speed

Weight

Noise level

Motor capacity

Location

3 nos

24 feet

60 rpm

85 kg

below 65 dB

1kW ,BLDC gearless

Passage of Pf no- 1 to 4=2 nos;

South passenger hall=1 no

3 nos

16 feet

90 rpm

70 Kg

below 60 dB

0.65kW ,BLDC gearless

In front of main Booking office=2 nos;

South booking office =1 no

ØAdvantage:-

·Huge energy saving.

·Noise level reduced to minimum.

8. All 17(seventeen) nos running rooms of over Sealdah division have been equipped with 1.5 TR, ‘Hitachi’ make star rated split type Air Conditioner machines.

9. Provision of 28(twenty eight) nos pre-paid energy meter of capacity 5-60 amp, ‘Secure’ make in place of conventional energy meter in different stalls (outsider) at Sealdah Railway Station.

10. Installation and commissioning of Solar water Heater on roof of Metro building in B.R. Singh Hospital of total capacity 3500 lts/hrs(seven nos each of 500 ltrs per hour).

11. Way leave charges received from DISCOM authority for power line crossing overthe division during the period Apil’20 to Nov, 20.

Sl no

Name of the DISCOM authority

Amount Realized (in Rs.)

1

PGCIL

2387363

2

CESC

39905597

3

WBSEDCL

3717018

Total

46009978

12. Installation and commissioning of Centralized VRF type air conditioning of capacity 24 HP in Nephrology ward in B. R. Singh Hospital with HEPA filter and all new Wiring and fittings including fan and light.

13. Provision of local power supply (single phase,230 vollt,2 KW ) in the following L.C gate:-

ØE/49 in between Karanjali-Nischindapur Market Railway Station.

ØE/42 in between Kulpi- Karanjali Railway Station

ØE/23 in betweenJaynagar,Majilpur- Mathurapur Road Railway Station

ØT/20 in between Baruipur- Mallickpur Railway Station.

ØE/23 in between Baruipur-Kalyanpur Railway Station.

ØE/11 in between Gocharan-Hogla Railway Station

ØT/13 in between DakshinBarasat-Kalyanpur Railway Station.

14. Provision of tractionpower supply in the following L.C gate:-

Ø8/E in betweenBarasat - Sondalia Railway Station:

Ø25/E in between Guma&Ashokenagar Railway Station.

Ø65/Ein between station Kakdwip&UkilerhatRailway Station

15. Provision of Three phase power supply with an agreemantal load of 35.29 KVA atBallyghat Railway Station from Calcutta Electric Supply Corporation (CESC).

16. Electrical wiring and provision of LED fitting in following newly built/renovated service buildingover SDAH division:-

Ø SM chamber at Diamond Harbour Railway station

Ø Booking office at Dhakuria Railway Station.

Ø PI cabin at Guma Railway Station.

17. Provision of 70%-30% lighting arrangement on 14 nos platform at Belgoria, Agarpara, Sodepur, Naihati, Ichapur, Maslandpur, Chandpara, Krishnanagar, sonarpur, ghutiarisharrif, gocharan, kalinarayanpur,Bidhyadharpur and Beldanga Railway station.

18. Provision of 27 (twenty seven) nos split and 11(eleven) nos window type star rated AC machines in place of conventional AC machines at various locations over SDAH Division.

19. Provision of 7(seven) nos split and 2 (two) nos window type star rated AC machines at various locations over SDAH Division.

20. Electrification of newly constructed auto signalling hut with the supply of Local and traction power at Jadavpur, Baghajatin, Ballygunge, Dhakuria, Garia , Sonarpur & Narendrapur Railway Station.

21. New wiring and air-conditioning of newly constructed seminar hall in engineering department of DRM Building.

22. Provision of 18 (Eighteen nos) RDSO panel of capacity 60amp/30 amp, in place of manual changeover switch in different LC gates, auto signalling hut and cabin over the Division.

23. Replacement of 220 (Two hundred Twenty ) nos heavy duty high wattage ceiling fans by light weight low wattage ceiling fans duringFY 2020-21.

24. DISCOM authority energy meter shifted from old Booking office to New Booking at Subhasgram and Mallickpur Railway station.

25. Electrical work done in connection with the work of Interlocking of LC Gate no-8/E in betweenBarasat - Sondalia Railway Station:-

ØProvision of 2(two nos) GI tubular pole of 5.5 mtrs with 45 watt LED outdoor fitting.

ØWiring of light and fan point in newly constructed IPS and Battery Room (Light point= 7 nos& Fan point= 2 nos)

ØProvision of RDSO panel of capacity 30amp, make- East Land Switchgear Pvt Ltd.

26. Provision of 10 (ten nos) 1x18 watt and 10(ten nos) 1x 20 watt LED fitting in place of T-5 fitting in the chamber of DME/Diesel/Beliaghata at Sealdah.

27. Provision of 22(twenty two) nos 18 watt, 4(four nos) 10 watt and 9(nine nos) 25 watt LED fitting and 1(one) no 1200 mm sweep ceiling fan of ‘Usha’ make in Signal office at Ranaghat Railway Station.

28. Provision of 11(eleven nos) 18 watt LED indoor fitting in PWI office at Ranaghat Railway Station.

29. Provision of 80 (Eighty nos) 36 watt recess mounted LED fitting near Enquiry in connection with the redevelopment of Sealdah Railway station.

30. Provision of 11(eleven nos) GI tubular pole of 5.5 mtr long with 45 watt LED outdoor fitting in place of defective MS tubular pole on pf no-2 at Shasan Road Railway station.

31. Provision of 10(ten nos) GI octagonal pole, 5.5 mtr high, in place of 7 (seven nos) MS tubular pole and three nos rail pole with the provision of 45 watt LED outdoor fitting on pf no-5 at Sealdah Railway Station.

32. Provision of nine nos water heater of capacity 15 ltrs in different location over Sealdah Division.

33. Provision of One New Open Well mono block pump with capacity -15 HP , 13.4/3.0 LPS, Head Range 64/82 mtrs. Make – Aquatex has been installed at New Alipur officers’ colony Block No. 7.

34. Three H.S. pumps with capacity 35640 GPS, 60 ft Head, Kirloskar make pumpshave been repaired and replaced at Gholesapur swimming pool.

35. One submersible pump with capacity of 15 HP, Head90’,Discharge 10,000 GPH (Make: KSB) has been installed at KRP/ running room as new provision.

36. One UV based storage water cooler cum purifier with capacity of 120 litrs. (Make- Eureka Forbes) has been installed which replacesnormal water cooler of capacity 380 liters(Make- Blue Star) at ground floor of OPD Bldg. at B.R Singh Hospital.

37. UP AT and DN AT supply have been provided also at LC gate no. 33 in between Ghorarasghana (GGV) andChampapukur (CQR) with existing RDSO panel with Local power.

38. Seventy Four (74) nos new star rated ceiling fans have been fitted in different locations in place of old fans

39. 28 nos Exhaust fan have been fixed properly with properwiring in Krishnapur runningroom and inverter installation with proper wiring have also done

40. Wiring, lighting and air conditioning of renovated ground floor of B.C Roy Auditorium.

Air conditioning:-

Location

IDU

ODU

Make

Main Hall

8TR×2

VRF (Ductable)

18HP×1

Blue Star

Dining Hall

10HP ×1

5HP ×2

VRF (Ductable)

20HP× 1

Hitachi

Billiard Room

10HP×1

10HP×1

Hitachi

Lighting:-

Sl.No

Capacity

Qty.

1

2’ × 2’ Recess Type LED, 36Watt

12 nos.

2

Recess Type LED, 18 Watt

16 nos.

3

LED fittings 1×18 Watt

22nos.

41. One star rated water heater of capacity 15litrs, (Make-Bajaj) has been provided e in place of conventional water heater in OT at BRSH.

42. Wiring and connections of new mini IPS Rooms for LC gates no 32 & 34 in between stations Udayrampur and Kulpi (URMP-KULPI) have been done and charged successfully

 

Coaching wing achievements2020-21

1.ZERO non ac case en-route during 2020-21 (up to Feb’2021).

2.Both SG rakes of Darjeeling mail have been converted to LHB rakes on 20.10.2020 and HOG service as 02343/44 SDAH- NJP Festival special started on same date.

3.HOG modification of all LHB power cars and Coaches has been completed.

4.Conversion of ICF manufactured Power cars and coaches of KOAA - PNBE GaribRath Express (EOG-Non LHB) has been completed departmentally and HOG service started from 06.02.2021.

5.HOG Service in between KOAA to NJP of train no. 03181/82 Kolkata – Silghat Covid-19 Spl started from 23.02.2021.

6.Service of 02021/02 SDAH – BBS Covid special has been started with one LSLRD replacing one Power car from 14.08.2020.

7.LSVP has been introduced in Rajdhani Express and PuriDuranto only on nominated days.

vHOG status of HOG converter LHBtrains

Sl. No.

Train No.

Train Name

Depot.

Rake

HOG Operation in between

HOG introduced on

1

12313/12314

RajdhaniExp

SDAH

3

SDAH - NDLS

25.11.16

2

12259/12260

Duronto Exp.

SDAH

3

SDAH - NDLS

17.12.17

3

12329/12330

WB S K Exp.

SDAH

1

SDAH- DLI

12.09.19

4

12379/12380

Jalianwalabag Exp.

SDAH

SDAH- ASR

06.09.19

5

22323/22324

Shabdabhedi Exp.

CP

1

KOAA- GCT

14.02.20

6

13121/13122

KOAA - GCT Weekly Exp.

CP

KOAA- GCT

16.02.20

7

12315/12316

Ananya Exp.

CP

2

KOAA- SWM

26.12.19

8

12317/12318

Akal Takht Exp.

CP

KOAA- ASR

22.12.19

9

12357/12358

Durgiana Exp.

CP

2

KOAA- ASR

07.01.20, 01.02.20

10

12319/12320

Kolkata Agra Exp.

CP

KOAA- DDU

19.02.20

11

13135/13136

Joynagar Exp.

CP

KOAA - JYG

22.02.20

12

12377/12378

PadatikExp*

SDAH

2

SDAH - NJP

08.07.20

13

22317/22318

Humsafar Express

SDAH

1

SDAH - JAT

31.12.18

14

22201/22202

PuriDuranta

SDAH

1

SDAH - PURI

06.09.19

15

13167/13168

KOAA- Agra Cant Exp.

CP

1

KOAA - DDU

19.03.20

16

13181/13182

Kaziranga Express*

CP

KOAA - NJP

23.02.21

17

12343/12344

Darjeeling Mail*

SDAH

2

SDAH - NJP

20.10.20

18

13109/13110

Moitraee Exp.

CP

1

NA

Running with DSL LOCO

19

13129/13130

Bandhan Exp.

CP

NA

Running with DSL LOCO

HOG service of three trains of Sl no. 12, 16 and 17 (marked with *) started as special trains.

vComparison of key performance indicators against HQ target :

AC & TL (Coaching wing)

YEAR

Sl No

Item

2018-19

2019-20

2020-21 (up to 25th Feb’21)

Target

Actual

Target

Actual

Target

Actual

1

Failure of AC coaches

1

0

1

0

1

0

( Non AC)

2