WELCOME
Electrical General Department
Eastern Railway, Sealdah
Organization Chart
Assets of Electrical (Power wing)
Power Supply installation
WBSEDCL Supply points (HT) | 21 nos |
CESC supply points (HT) | 22 nos |
WBSEDCL Supply points (LT) | 350 nos |
CESC supply points (LT) | 86 nos |
Standby DG Sets | 27 nos |
Total no. of stations | 204 Nos |
Electrified stations | 204 Nos |
Non-Electrified station | Nil |
Other Asset
Electrified occupied Quarters | 4284 |
Lifts | 42 nos |
Escalator | 12 nos |
Major Building/Complex | 6 nos |
Electrified LC Gate | 410 nos |
Non-Electrified LC Gate | nil |
Central AC plant | 71 nos |
AC package Unit | 16 nos |
Window AC unit | 380 nos |
Split AC unit | 576 nos |
Tower AC | 6 nos |
Non-traction Energy Consumption & Billpattern
Year | Consumption (MU) | Bill (Rs in Crore) |
2015-16 | 50.54 | 44.18 |
2016-17 | 48.26 | 40.67 |
2017-18 | 45.95 | 39.39 |
2018-19 | 42.35 | 37.16 |
2019-20 | 41.58 | 36.55 |
2019-20 (up to Feb’20) | 38.92 | 34.08 |
2020-21 (up to Feb’21) | 30.79 | 27.37 |
Achievements during 2020-21(uptoMarch’2021)
1.
1. Reduction in Non-traction energy consumption by 20.90 % in comparison to last year (Up to Feb ’20)
2. Reduction in Non-traction energy bill by 19.69 % in comparison to last year (Up to Feb’ 21).
3. Repair/Rehabilitation of electrical equipments, wiring, cabling etc at Beldanga, Lalgola, Krishnapur, Rejinagar and Sargachi due to damage on account of agitation against CAA on 15.12.2019.
4. Installation and commissioning of 2(two)nos elevator of capacity 10 passengers, G+3, ‘’Johnson’’ make near South Booking office at Sealdah Railway station.
5. Installation and commissioning of 1(One) no elevator of capacity 13 passengers, G+1, ‘’Johnson’’ make at Cossimbazar Railway station.
6. Installation of 2(two) nos escalator of capacity 9000 persons per hour,‘’Johnson’’ make at Sealdah Railway station.
7. Provision of 6 (six nos) HVLS (HIGH VOLUME LOW SPEED) fans with following specification in south passenger hall of Sealdah Railway station.
ØSpecification of HVLS fan:-
No of blades | Sweep | maximum speed | Weight | Noise level | Motor capacity | Location |
3 nos | 24 feet | 60 rpm | 85 kg | below 65 dB | 1kW ,BLDC gearless | Passage of Pf no- 1 to 4=2 nos; South passenger hall=1 no |
3 nos | 16 feet | 90 rpm | 70 Kg | below 60 dB | 0.65kW ,BLDC gearless | In front of main Booking office=2 nos; South booking office =1 no |
ØAdvantage:-
·Huge energy saving.
·Noise level reduced to minimum.
8. All 17(seventeen) nos running rooms of over Sealdah division have been equipped with 1.5 TR, ‘Hitachi’ make star rated split type Air Conditioner machines.
9. Provision of 28(twenty eight) nos pre-paid energy meter of capacity 5-60 amp, ‘Secure’ make in place of conventional energy meter in different stalls (outsider) at Sealdah Railway Station.
10. Installation and commissioning of Solar water Heater on roof of Metro building in B.R. Singh Hospital of total capacity 3500 lts/hrs(seven nos each of 500 ltrs per hour).
11. Way leave charges received from DISCOM authority for power line crossing overthe division during the period Apil’20 to Nov, 20.
Sl no | Name of the DISCOM authority | Amount Realized (in Rs.) |
1 | PGCIL | 2387363 |
2 | CESC | 39905597 |
3 | WBSEDCL | 3717018 |
| Total | 46009978 |
12. Installation and commissioning of Centralized VRF type air conditioning of capacity 24 HP in Nephrology ward in B. R. Singh Hospital with HEPA filter and all new Wiring and fittings including fan and light.
13. Provision of local power supply (single phase,230 vollt,2 KW ) in the following L.C gate:-
ØE/49 in between Karanjali-Nischindapur Market Railway Station.
ØE/42 in between Kulpi- Karanjali Railway Station
ØE/23 in betweenJaynagar,Majilpur- Mathurapur Road Railway Station
ØT/20 in between Baruipur- Mallickpur Railway Station.
ØE/23 in between Baruipur-Kalyanpur Railway Station.
ØE/11 in between Gocharan-Hogla Railway Station
ØT/13 in between DakshinBarasat-Kalyanpur Railway Station.
14. Provision of tractionpower supply in the following L.C gate:-
Ø8/E in betweenBarasat - Sondalia Railway Station:
Ø25/E in between Guma&Ashokenagar Railway Station.
Ø65/Ein between station Kakdwip&UkilerhatRailway Station
15. Provision of Three phase power supply with an agreemantal load of 35.29 KVA atBallyghat Railway Station from Calcutta Electric Supply Corporation (CESC).
16. Electrical wiring and provision of LED fitting in following newly built/renovated service buildingover SDAH division:-
Ø SM chamber at Diamond Harbour Railway station
Ø Booking office at Dhakuria Railway Station.
Ø PI cabin at Guma Railway Station.
17. Provision of 70%-30% lighting arrangement on 14 nos platform at Belgoria, Agarpara, Sodepur, Naihati, Ichapur, Maslandpur, Chandpara, Krishnanagar, sonarpur, ghutiarisharrif, gocharan, kalinarayanpur,Bidhyadharpur and Beldanga Railway station.
18. Provision of 27 (twenty seven) nos split and 11(eleven) nos window type star rated AC machines in place of conventional AC machines at various locations over SDAH Division.
19. Provision of 7(seven) nos split and 2 (two) nos window type star rated AC machines at various locations over SDAH Division.
20. Electrification of newly constructed auto signalling hut with the supply of Local and traction power at Jadavpur, Baghajatin, Ballygunge, Dhakuria, Garia , Sonarpur & Narendrapur Railway Station.
21. New wiring and air-conditioning of newly constructed seminar hall in engineering department of DRM Building.
22. Provision of 18 (Eighteen nos) RDSO panel of capacity 60amp/30 amp, in place of manual changeover switch in different LC gates, auto signalling hut and cabin over the Division.
23. Replacement of 220 (Two hundred Twenty ) nos heavy duty high wattage ceiling fans by light weight low wattage ceiling fans duringFY 2020-21.
24. DISCOM authority energy meter shifted from old Booking office to New Booking at Subhasgram and Mallickpur Railway station.
25. Electrical work done in connection with the work of Interlocking of LC Gate no-8/E in betweenBarasat - Sondalia Railway Station:-
ØProvision of 2(two nos) GI tubular pole of 5.5 mtrs with 45 watt LED outdoor fitting.
ØWiring of light and fan point in newly constructed IPS and Battery Room (Light point= 7 nos& Fan point= 2 nos)
ØProvision of RDSO panel of capacity 30amp, make- East Land Switchgear Pvt Ltd.
26. Provision of 10 (ten nos) 1x18 watt and 10(ten nos) 1x 20 watt LED fitting in place of T-5 fitting in the chamber of DME/Diesel/Beliaghata at Sealdah.
27. Provision of 22(twenty two) nos 18 watt, 4(four nos) 10 watt and 9(nine nos) 25 watt LED fitting and 1(one) no 1200 mm sweep ceiling fan of ‘Usha’ make in Signal office at Ranaghat Railway Station.
28. Provision of 11(eleven nos) 18 watt LED indoor fitting in PWI office at Ranaghat Railway Station.
29. Provision of 80 (Eighty nos) 36 watt recess mounted LED fitting near Enquiry in connection with the redevelopment of Sealdah Railway station.
30. Provision of 11(eleven nos) GI tubular pole of 5.5 mtr long with 45 watt LED outdoor fitting in place of defective MS tubular pole on pf no-2 at Shasan Road Railway station.
31. Provision of 10(ten nos) GI octagonal pole, 5.5 mtr high, in place of 7 (seven nos) MS tubular pole and three nos rail pole with the provision of 45 watt LED outdoor fitting on pf no-5 at Sealdah Railway Station.
32. Provision of nine nos water heater of capacity 15 ltrs in different location over Sealdah Division.
33. Provision of One New Open Well mono block pump with capacity -15 HP , 13.4/3.0 LPS, Head Range 64/82 mtrs. Make – Aquatex has been installed at New Alipur officers’ colony Block No. 7.
34. Three H.S. pumps with capacity 35640 GPS, 60 ft Head, Kirloskar make pumpshave been repaired and replaced at Gholesapur swimming pool.
35. One submersible pump with capacity of 15 HP, Head90’,Discharge 10,000 GPH (Make: KSB) has been installed at KRP/ running room as new provision.
36. One UV based storage water cooler cum purifier with capacity of 120 litrs. (Make- Eureka Forbes) has been installed which replacesnormal water cooler of capacity 380 liters(Make- Blue Star) at ground floor of OPD Bldg. at B.R Singh Hospital.
37. UP AT and DN AT supply have been provided also at LC gate no. 33 in between Ghorarasghana (GGV) andChampapukur (CQR) with existing RDSO panel with Local power.
38. Seventy Four (74) nos new star rated ceiling fans have been fitted in different locations in place of old fans
39. 28 nos Exhaust fan have been fixed properly with properwiring in Krishnapur runningroom and inverter installation with proper wiring have also done
40. Wiring, lighting and air conditioning of renovated ground floor of B.C Roy Auditorium.
Air conditioning:-
Location | IDU | ODU | Make |
Main Hall | 8TR×2 VRF (Ductable) | 18HP×1 | Blue Star |
Dining Hall | 10HP ×1 5HP ×2 VRF (Ductable) | 20HP× 1 | Hitachi |
Billiard Room | 10HP×1 | 10HP×1 | Hitachi |
Lighting:-
Sl.No | Capacity | Qty. |
1 | 2’ × 2’ Recess Type LED, 36Watt | 12 nos. |
2 | Recess Type LED, 18 Watt | 16 nos. |
3 | LED fittings 1×18 Watt | 22nos. |
41. One star rated water heater of capacity 15litrs, (Make-Bajaj) has been provided e in place of conventional water heater in OT at BRSH.
42. Wiring and connections of new mini IPS Rooms for LC gates no 32 & 34 in between stations Udayrampur and Kulpi (URMP-KULPI) have been done and charged successfully
Coaching wing achievements2020-21
1.ZERO non ac case en-route during 2020-21 (up to Feb’2021).
2.Both SG rakes of Darjeeling mail have been converted to LHB rakes on 20.10.2020 and HOG service as 02343/44 SDAH- NJP Festival special started on same date.
3.HOG modification of all LHB power cars and Coaches has been completed.
4.Conversion of ICF manufactured Power cars and coaches of KOAA - PNBE GaribRath Express (EOG-Non LHB) has been completed departmentally and HOG service started from 06.02.2021.
5.HOG Service in between KOAA to NJP of train no. 03181/82 Kolkata – Silghat Covid-19 Spl started from 23.02.2021.
6.Service of 02021/02 SDAH – BBS Covid special has been started with one LSLRD replacing one Power car from 14.08.2020.
7.LSVP has been introduced in Rajdhani Express and PuriDuranto only on nominated days.
vHOG status of HOG converter LHBtrains
Sl. No. | Train No. | Train Name | Depot. | Rake | HOG Operation in between | HOG introduced on |
1 | 12313/12314 | RajdhaniExp | SDAH | 3 | SDAH - NDLS | 25.11.16 |
2 | 12259/12260 | Duronto Exp. | SDAH | 3 | SDAH - NDLS | 17.12.17 |
3 | 12329/12330 | WB S K Exp. | SDAH | 1 | SDAH- DLI | 12.09.19 |
4 | 12379/12380 | Jalianwalabag Exp. | SDAH | SDAH- ASR | 06.09.19 |
5 | 22323/22324 | Shabdabhedi Exp. | CP | 1 | KOAA- GCT | 14.02.20 |
6 | 13121/13122 | KOAA - GCT Weekly Exp. | CP | KOAA- GCT | 16.02.20 |
7 | 12315/12316 | Ananya Exp. | CP | 2 | KOAA- SWM | 26.12.19 |
8 | 12317/12318 | Akal Takht Exp. | CP | KOAA- ASR | 22.12.19 |
9 | 12357/12358 | Durgiana Exp. | CP | 2 | KOAA- ASR | 07.01.20, 01.02.20 |
10 | 12319/12320 | Kolkata Agra Exp. | CP | KOAA- DDU | 19.02.20 |
11 | 13135/13136 | Joynagar Exp. | CP | KOAA - JYG | 22.02.20 |
12 | 12377/12378 | PadatikExp* | SDAH | 2 | SDAH - NJP | 08.07.20 |
13 | 22317/22318 | Humsafar Express | SDAH | 1 | SDAH - JAT | 31.12.18 |
14 | 22201/22202 | PuriDuranta | SDAH | 1 | SDAH - PURI | 06.09.19 |
15 | 13167/13168 | KOAA- Agra Cant Exp. | CP | 1 | KOAA - DDU | 19.03.20 |
16 | 13181/13182 | Kaziranga Express* | CP | KOAA - NJP | 23.02.21 |
17 | 12343/12344 | Darjeeling Mail* | SDAH | 2 | SDAH - NJP | 20.10.20 |
18 | 13109/13110 | Moitraee Exp. | CP | 1 | NA | Running with DSL LOCO |
19 | 13129/13130 | Bandhan Exp. | CP | NA | Running with DSL LOCO |
HOG service of three trains of Sl no. 12, 16 and 17 (marked with *) started as special trains.
vComparison of key performance indicators against HQ target :
AC & TL (Coaching wing)
| | YEAR |
Sl No | Item | 2018-19 | 2019-20 | 2020-21 (up to 25th Feb’21) |
Target | Actual | Target | Actual | Target | Actual |
| |
1 | Failure of AC coaches | 1 | 0 | 1 | 0 | 1 | 0 |
( Non AC) |
2 | AC Coach failure | 2 | 0 | 2 | 0 | 2 | 0 |
(LOP cases) |
3 | TL Coach failure | 1 | 0 | 1 | 0 | 1 | 0 |
(LOP cases) |
4 | Ineffective of AC coaches (%) | 1.5 | 0.123 | 1.5 | 0.21 | 1.5 | 0.054 |
5 | Ineffective of TL coaches (%) | 1 | 0.0213 | 1 | 0.016 | 1 | 0.003 |
COACHING PERFORMANCE
Non AC Cases |
|
|
|
|
|
Sl. No. | Year | No. of Cases - | Total |
AC coaches |
1 | 2018 - 2019 | 0 | 0 |
2 | 2019 - 2020 | 0 | 0 |
3 | 2020 - 2021 | 0 | 0 |
Ineffective status of AC coaches
YEAR | Ineffective Percentage (%) |
2018 - 2019 | 0.123 |
2019 - 2020 | 0.210 |
2020- 21 (upto Feb’20) | 0.054 |
|
|

Ineffective status of TL coaches |
|
YEAR | INEFFECTIVE % OF TL Coaches |
|
| 2018 - 2019 | 0.0213 | 2019 - 2020 | 0.0213 | 2020- 21 (upto Feb’20) | 0.003 |
Month wise Comparison of HSD Oil fuelling (Ltr) in Power cars at primary depot : Month | 2018-19 | 2019-20 | 2020-21 | Apr | 244881 | 350557 | 0 | May | 309516 | 385828 | 6334 | Jun | 326707 | 426863 | 81323 | Jul | 307791 | 385449 | 50818 | Aug | 298782 | 369693 | 29210 | Sep | 301958 | 341784 | 42402 | Oct | 287282 | 326673 | 88482 | Nov | 235733 | 270126 | 66044 | Dec | 203403 | 192713 | 50167 | Jan | 184261 | 165461 | 65751 | Feb | 187143 | 152532 | 70785 | Total | 2887457 | 3367679 | 551316 | |