Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter View Content in Hindi
National Emblem of India

About Us

Divisions

News & Updates

Tenders

Supplier Information

Passenger information

Contact Us

About Us
   Workshop
      LILUAH
         About Us
            GOOD WORKS


 
Bookmark Mail this page Print this page
QUICK LINKS
GOOD WORKS

GOOD WORKS FOR THE MONTH OF FEBRUARY 2021



  • This month 02 no. camping coaches (ER 99233 RCC & ER 00208 RCC) have been converted and turned out from LLH. (Cumulative for this FY-17 nos.).
  • This month 02 nos. LHB/NAC LS-3 coaches (ER 14445 & ER 16420) have been upgraded to LS-5 coaches with “FIBA” device installed in LLH. (Cumulative for this FY-22 nos.)
  • The installation work of Fire Detection & Suppression System in LHB Power & Pantry Car coaches started in Liluah Workshop. During this month 14 nos. (LHB/AC-10 nos. & Pantry-04 nos.) fitted with this system. {Cumulative: LHB/AC-77, LHB Power Car-55 (Power Car Works comp.) & Pantry-47 nos.}
  • Liluah Workshop has started Stainless Steel Wagon POH for first time and 04 (four) wagons have been turned out in the month of Feb’21.
  • Unsafe and abandoned MOD Building has been disposed through Dy. CMM / BESY for a value of Rs.13 Lakhs.
  • Industry 4.0 has been implemented and wheel shop has been covered for monitoring of performance.
  • Commissioning of Wheel Balancing Machine for LHB has been done as wheel balancing is mandatory for speeds above 130 KMPH.
  • In-House Repairing of CNC Spring Testing Machine (E-50)
  • Repairing of Roller of Spring Shot Blasting Machine (E-48) instead of replacing the same with a saving of 2 Lakhs 30 thousand.
  • UMID [Position as on 28-02-2021]
  • Total Strength Registered Users Registered % Applications pending with Employee Applications pending with Employee % Applications pending with Administration Applications pending with Administration % Card Generated Card Generated %
    7610 7545 99.10% 74 1.00% 19 0.20% 7452 97.90%

  • HRMS [Position as on 28-02-2021]
  • Total Strength Employee Master e-SR
    Entered % Entered Verified % Verified Accepted % Accepted Entered % Entered Accepted % Accepted
    7578 7328 96.70% 7309 96.50% 7223 95.30% 7371 97.30% 7251 95.70%

  • e-Pass [as on 28-02-2021]
  • Total No. of Pass application (Manual + ePass) received in Feb, 2021 No. of Passes issued manually in Feb, 2021 No. of Passes issued through ePass module of HRMS in Feb, 2021 % of ePass generated through HRMS module in Feb, 2021
    3084 NIL 3084 100%

  • e-Office Order in HRMS [as on 28-02-2021]
  • Total No. of Office Order (Manual + through HRMS) issued in Feb, 2021 No. of Office Order issued manually in Feb, 2021 No. of Office Order issued through e-Office Order module of HRMS in Feb, 2021 % of e-Office Order generated through HRMS module in Feb, 2021
    42 NIL 42 100%




    Source : Eastern Railway CMS Team Last Reviewed on: 02-03-2021  


      Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

    © 2016  All Rights Reserved.

    This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.