Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter View Content in Hindi
National Emblem of India

About Us

Divisions

News & Updates

Tenders

Supplier Information

Passenger information

Contact Us



Goto Yahoo!!


 
Bookmark Mail this page Print this page
QUICK LINKS


HOWRAH DIESEL SHED

LOCO HOLDING

SHED

CLASS

TOTAL

HOWRAH

WDM3D

WDM3A

WDM2

WDS6R

73

20

31

04

18


INFRASTRUCTURE

                                                                        No. of Bays                          Berthing capacity

Light & heavy repair Bays           :                  04                                     13 locos

Under carriage Bays                     :                  01                                     02 locos

Additional Platform for Load Box & loco washing / Air blowing.

Fuelling installation                        :           Three storage tanks. One tank is of 381 KLs Two Tanks are of 243 KLs capacity.       

LO dispensing plant                      :           02 Tanks with 50 KLs  capacity each.

No. of Load Box                             :           One Load Box of Resistance type is available in shed.

Crane facility                                   :           05 Crânes are available (40T- 01, 10T- 01, 05T- 01& 03T- 02).

Wheel Lathe                                     :           One under floor wheel lathe of M/s. HEGENSCHEIDT / West Germany is in operation since 28/05/1985.

Effluent Treatment Plant              :           One Effluent Treatment Plant (ETP) has been constructed for treating effluents of diesel shed so that discharge from ETP (20000lts./day) conforms to the norms laid down by West Bengal Pollution Control Board. The ETP was commissioned on 03/01/2001.

DM Water Plant                               :           One DM water plant is available in the shed capable of supplying 3000 lts. of DM water everyday. The DM water was commissioned on July,2006.

Compressor                                 :           01 (Capacity 607 cfm) compressor are available.


PERFORMANCE AT A GLANCE

ITEM

Per 100 loco per month

CLASS

TARGET 2015-16

Average         2015-16

(Up to June)

Average      2014-15

(Up to June)

OUTAGE

M2/M3

88.27

88.29

87.46

6R

85.87

82.67

78.87

INEFF%

M2/M3

9.09

9.54

9.19

6R

6.50

9.22

12.79

EQ FAILURE

All Loco

3.32

4.85

5.85

PUNCT LOSS

Pass Loco

6.22

10.81

7.02

LO Cons/ 100 Ekms

M2/M3

1.38

1.31

1.33

6R

0.56

0.51

0.49

LO to FO Ratio

M2/M3

0.36

0.33

0.33

6R

0.48

0.44

0.44

LO SHED ISSUE AV/ Mth

All Loco

16179

15004

17346



********************************************************************************************


BURDWAN DIESEL SHED

LOCO HOLDING

SHED

CLASS

TOTAL

HOWRAH

WDM3D

WDM3A

WDM2

WDM6

70

-

53

15

02


INFRASTRUCTURE

                                                                       

Total No. of Berths                        :           12 berth capacity for maintenance. Additional Platform for                                                                        Load Box, Loco Washing, Air Blowing

LO dispensing plant                      :           02 Tanks with 50 KLs  capacity each (Supply is received from M/s. IOC/Durgapur, 50 days stock.

No. of Load Box                             :           One Load Box of Grid Resistance type is available in shed.

Crane facility                                  :           05 Crânes are available (40T- 01, 10T- 01 & 03T- 03).

Wheel Lathe                                     :           One Pit type automatic CNC under floor wheel lathe (HEC Make).

Effluent Treatment Plant            :           One Effluent Treatment Plant (ETP) has been constructed for treating effluents of diesel shed so that discharge from ETP(20000lts./day) conforms to the norms laid down by West Bengal Pollution Control Board.

Compressor                                    :           02 (capacity 520 cfm & 607cfm) Compressor are available.

Diesel Generating Set                   :           Two 144 KVA DG set are available in shed.


PERFORMANCE AT A GLANCE

ITEM

Per 100 loco per month

CLASS

TARGET 2015-16

Average         2015-16

(Up to June)

Average      2014-15

(Up to June)

OUTAGE

M2/M3

88.60

88.66

89.13

6R

83.50

94.94

76.50

INEFF%

M2/M3

7.19

6.74

6.37

6R

6.40

2.22

11.58

EQ FAILURE

All Loco

2.4

3.43

0.98

PUNCT LOSS

Pass Loco

4.40

6.06

1.42

LO Cons/ 100 Ekms

M2/M3

1.27

1.29

1.21

6R

0.62

0.21

0.29

LO to FO Ratio

M2/M3

0.39

0.40

0.38

6R

0.37

0.12

0.21

LO SHED ISSUE AV/ Mth

All Loco

14183

14273

13809

                                              




Source : Eastern Railway CMS Team Last Reviewed on: 24-07-2015  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.