B.   Energy Consumption

Year

Unit Consumed

 (million KWh)

Energy Bill       (Rs. in Crores)

Average Monthly consumption       (Million KWh)

Average energy cost paid per unit (Rs.)

2013– 2014

52.87

41.65

4.41

7.88

2014– 2015

54.71

45.94

4.56

8.40

2015– 2016

(Up to May’15)

9.41

7.99

4.70

8.50

     

       

      C.  Performance

Sl.

No.

Item

YEAR

2013-14

2014-15

2015-16

( Up to June’15 )

Target

Actual

Target

Actual

Target

Actual

AC & TL (Coaching)

1

Failure of AC coaches (Non AC)

-

1

-

1

-

-

2

AC Coach failure (LOP cases)

-

6

-

9

-

2

3

TL Coach failure (LOP cases)

-

2

-

4

-

-

4

Ineffective of AC coaches (%)

-

0.54

-

0.61

-

0.64

5

Ineffective of TL coaches  (%)

-

0.03

-

0.02

-

0.01

                                                                      Power Wing       

1

Electrifications of LC Gates

-

5

9

6

-

-

2

Provision of  T5 fittings in place of T12  fittings in office buildings & railway quarters (nos.)

-

868

-

690

-

102

3

Non-Traction energy consump-tion  in MU   

53.35

52.87

53.35

54.71

-

9.41

4

Segregation of 70-30 circuit at Platform (No. of stations)

-

4

-

-

-

-

D.  Major Assets :

  ELECTRICAL POWER                             

High Voltage Intake 6 kV Sub–Stations               : 07

High Voltage 6 kV Sub–Stations                         : 04

High Voltage Intake 11 kV Sub–Stations             : 14

         High Voltage 11 kV Sub–Stations              : 14

         High Voltage 33 kV Sub–Stations              : 01

         High Voltage 132 / 33 kV Sub–Stations      : 01

         LT Power Supply Points                           : 333

Standby D.G. Sets                                            : 46 

     

E.  Electrified Residential Quarters:

Type of Qtrs.

I

 II 

III

IV

 V 

Total

No. of Qtrs.

7644

2880

412

133

122

11191


F.  Air Conditioning Plants & Equipments

Type of Plants & Equipments

HWH

HQ & Old Koilaghat

Total

Central AC Plants

3

-

3

Window / Split ACs

273

307

580

Water Coolers

129

14

143

Refrigerators

9

8

17

 

G.  Passenger / Goods Lifts  and  Escalators

Sl. No.

Location

Nos.

LIFT/ ESCALATOR

1

Howrah Old Station Complex

03

Passenger lift

2

Howrah New Station Complex

05

Passenger lift

3

Howrah Printing Press

01

Goods lift

4

Howrah DRM Building

01

Passenger lift

5

Howrah Colvin Court

02

Passenger lift

6

Howrah Orthopaedic Hospital

02

Bed Cum Passenger lift

7

HQ / Fairlie Place

05

Passenger & Goods lift

8

Howrah PF No. 14 & 17

02

Passenger Escalator

Total

21


H.  Manned  Level  Crossing  Gates ( Howrah Division )

Total Manned LC Gate

Total LC Gate Electrified

LC Gate Electrified by Solar

Non-Electrified

LC Gate

293

291

31

2





I.COACHING

      Air-Conditioned Coaches           :  431

      Train Lighting Coaches             :  1562


J.  Staff Strength

Total Staff Strength               :  2615 ( On Roll ) 




Source : Eastern Railway CMS Team Last Reviewed on: 23-07-2015  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.