Name: Shri H. K Pandey
Designation: Senior Divl. Electrical Engineer (General)/Asansol
Tel(O): 0341-2304620

email: srdee_g@asn.railnet.gov.in

 
Job Profile
 
Senior Divisional Electrical Engineer (General) is the Administrative head of Electrical(General) wing. He looks after daily maintenance of electrical assets, installations and co-ordinates with State Electricity Board to facilitate Electric supply in his jurisdiction over the division. He also looks after the Electrical maintenance of Train Lighting and Air Conditioned coaches.



Asset of Electrical General, Asansol

Coaching:


1. 

Holding of AC Coaches

11

2. 

Holding of Non- AC Coaches

157

3. 

Primary of Maintenance Depot

1

4. 

Primary Trains

11

5. 

Secondary Trains

3

Staff Strength:


Staff Strength:

693

Achievement of Action Plan Item 2013-14:


Sl. No.

Activity

HQ Target

Cumulative

1. 

Punctuality loss

Nil

0

2. 

Electrification of Station

01

0

3. 

Electrification of LC gates

04

4

4. 

Provision of water cooler at Stations

Nil

3

5. 

Rewiring of Railway Qrts.

Nil

49

6. 

Provision of T-5 FL fittings in place of T-12 FL fittings

3000

2621

7. 

Replacement of defective Energy Meters in Qrts.

Nil

2291

Power Supply Installation:


Sl No.

Items

Nos.

1. 

11 KV Sub stations

24

2. 

6 KV Sub station

Nil

3. 

Standby DG Set

30

4. 

IPC Ltd. (DPSC Ltd.) supply points

13

5. 

WBSEDCL supply points

50

6. 

JSEB supply points

54

7. 

DPL supply points

2

8. 

CLW supply points

1

9. 

Total nos. of stations

77

10. 

Electrified stations

77

11. 

Non-electrified station

Nil

Other Asset:


Sl No.

Items

Nos.

1. 

Quarters

10061

2. 

Lift

1

3. 

Major buildings/Complex

6

4. 

Electrified LC gates

171

5. 

Non-Electrified LC gates

8

6. 

Central AC plant

14

7. 

AC Package unit

Nil

8. 

Window/split AC Units

184

9. 

Escalator

Nil

Achievement of Action Plan Item 2013-14:


Sl No.

Activity

HQ Target

Cumulative

1. 

Failure of AC coach

Nil

0

2. 

AC coach Failure (LOP cases)

Nil

0

3. 

TL Coach Failure(LOP cases)

Nil

0

4. 

Ineffective AC Coaches (%)

Nil

0.006

5. 

Ineffective TL Coaches (%)

Nil

0.112

 

Energy Consumption (Non-traction):


Year

2011-12 (Feb)

2012-13 (Feb)

2013-14 (Feb)

Monthly Consumption (MU)

2.80

2.58

2.02

 

* 11 KV crossing is being eliminated at Barachak, Barakar and Nimcha.

* Cable crossing at LC Gate is required at Gate No.37C, 38C, 39C, 17/C/E and 18/C/E.




Source : Eastern Railway CMS Team Last Reviewed on: 25-02-2016  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.